Del Val architecture meeting

George Kopec of Settembrino Architects presents renderings to replace the windows at Delaware Valley High School (Christine Lee | Hunterdon County Democrat)

ALEXANDRIA TOWNSHIP The Delaware Valley Board of Education heard about options for replacing windows in the building.

During the meeting on Oct. 27, the board heard three architectural rendering options for replacing the windows on three parts of the building by George Kopec from Settembrino Architects.

The first option would cost $1.9 to $2.1 million and would save 44 percent in energy costs. The second option costs $1.5 to $1.6 million and would save 87 percent in energy costs. The third option costs $1.7 to $1.8 million, also saving 87 percent in energy costs. The costs would include the window treatments.

Settembrino presented the board with a sample of the materials used for construction. After discussing the three options, the board chose option three as it was more energy and cost-effective.

Christine Lee may be reached at clee@njnpublishing.com. Follow her on Twitter @Cleespot. Find The Hunterdon County Democrat on Facebook.

Read more:
Delaware Valley board hears options for window replacement project

Related Posts
October 27, 2014 at 9:44 pm by Mr HomeBuilder
Category: Window Replacement