BUILDING PERMITS

Building construction permits over $10,000 in value that were approved in Boulder between Jan. 13, 2014 to Jan. 19, 2014. Listed below are: the case number; address; total project valuation; owner name; contractor (if applicable); and description.

PMT2013-04026 4910 Nautilus Court; $11,033,783; Avery; Saunders Construction Inc.; Construction of new two-story building for Avery Brewing Company. Scope of work includes construction of insulated concrete tilt-up and steel stud exterior walls, steel roof decking, and a mix of steel framing, steel stud partition, and CMU partition and fire-rated walls at the interior. Foundations consist of driven steel piles. Floors are composed of composite deck and structural concrete slabs. Refer to LUR2012-00012; TEC2012-00054; TEC2013-00024; TEC2013-00041

PMT2013-04879 516 College Ave.; $950,000; Suzanne O'Neill; Field West Construction LLC; New two-story, single-family dwelling with finished basement. House has five bedrooms, one main level office/guestroom, and five baths. Two-car garage is attached.

PMT2013-05256 5048 Ralston St.; $1,307,000; Dirk Martin; Markel Homes Construction Co.; Proposal to construct a 12-unit condo building for Dakota Ridge Village (Building 11, Phase 1, Block 4). Each unit has 2 bedrooms, one and a half bathrooms, 950 square feet. No garages.

PMT2013-06459 1000 Alpine Ave.; $2,987,150; Mental Health; Deneuve Construction Services; MHP Wellness and Education Center - Remodel of existing interior medical building. Medical clinic with medical, administrative, and professional offices. Kitchen/staff cafeteria is an accessory use to medical clinic and office use and will not be open to the public. Large community and staff cafeteria area is considered A3.

PMT2013-06745 3990 Darley Ave.; $75,000; David and Jenny Savidge; Interior remodel of basement and main level. Structural work includes reconfiguration of existing stairs, addition of four skylights, alteration of three lower-level windows to meet egress requirements, and dropped beams in basement at bearing wall. Scope includes addition of bathroom in basement, reconfiguration of two main level baths and a kitchen remodel.

PMT2013-06912 3200 Walnut St.; $179,000; Bmr-3200 Walnut; Howell Construction; Building 4, second floor. Tenant remodel of 1,800 square feet for new conference room, mailroom, and three new offices. Changes for existing tenant Array Biopharma. Includes associated electrical and mechanical. No plumbing.

PMT2013-07026 2625 Kohler Drive; $39,865; John and Andrea Clyne; Ram Jack of Colorado Inc.; Structural repair associated with damage resulting from water damage. Scope of work to include electrical rewiring, drywall and wall insulation in area of repair.

PMT2013-07043 1620 Pearl St.; $410,000; 1600 Pearl; Swinerton Builders; Phase I -- tenant remodel of western portion of second floor for offices for Solidfire. Scope of work includes adjustment of interior non-bearing walls, installation of 4 accessible showers, associated electrical, mechanical and plumbing work. Phase II work by separate review and separate permit at a later date.

Continued here:
Boulder building permits: Jan. 27, 2014

Related Posts
January 26, 2014 at 10:40 pm by Mr HomeBuilder
Category: Sunroom Addition