BRAINARDSVILLE After repeated washouts, the Bryant Siding Road bridge here will be replaced.

The Bellmont Town Council discussed its reconstruction with contractor Jon Hutchins at a recent meeting.

Days of hard rain washed out the bridge in 1998, but repair was made quickly.

Heavy rains last fall also compromised the span, and it happened again this past March, according to meeting minutes.

There are about eight families living on that road, but none with school-age children that have to take the bus, said Town Supervisor Bruce Russell.

We have an arrangement with a logging company to use their road as an egress in case of an emergency, like the bridge being washed out.

Those families had to use that auxiliary road for three days before we made temporary repairs.

SHARED EFFORT

With direction from the State Department of Environmental Conservation and the Adirondack Park Agency, the bridge was braced up and is presently usable.

It will eventually be replaced with a more permanent structure that can handle the sudden flow of water emitted during heavy rainstorms and melting snow from the Ragged Lake outlet, which is fairly calm most of the year, the minutes said.

Read this article:
Your Town: Bellmont bridge shored up for now

Related Posts
May 8, 2014 at 4:41 pm by Mr HomeBuilder
Category: Siding replacement