Description of Modular Second Story Addition Construction

The existing roof will be completely removed and and the home will be prepped for the new addition. The existing air handler and duct work will be removed from the existing attic. The chimney will be cut down prior to installation of the modular addition. The new second story addition will be delivered in the form of two modules.Both modules will be hoisted into place using a crane. Once the modules have been placed into the correct position the existing chimney will be extended to protrude through the new roof. The new second story addition will overhang approximately 1' over the front and back of the existing house's lower level exterior walls. The A/C will be reinstalled in the new attic and new ductwork will be extended into both levels. The new staircase will be installed over the existing basement stairway. Once the addition has been set in place, all of the electrical and mechanical connections will be made in the basement. Flooring, trim, and drywall will be finished and the end result will be seamless. Check out the construction costs below.

Read the original here:
Add A Level Modular Addition - SimplyAdditions.com

Related Posts
April 20, 2016 at 10:49 am by Mr HomeBuilder
Category: Second Story Additions