Paris Heres a look at work planned in the district during the week of Aug. 17, 2020. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel throughwork zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Sherman Area (Fannin, Grayson Counties)Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.US 75, Grayson County: from FM 1417 to SH 91 (Texoma Parkway). Watch for shoulder closures and lane shifts on northbound and southbound US 75 between Center Street and FM 1417 as crews work on building new main lanes and the new South Travis Street Bridge. Watch for lane closures on the frontage roads between FM 1417 and Washington Street as crews workon building detours and installing drainage structures. The northbound exit ramp for Houston and Lamar is currently closed, and exiting traffic is requested to use the Park Avenue exit ramp.The southbound exit ramp for Park Avenue is currently closed and exiting traffic is requested to use the Houston/Lamar Street exit. The northbound frontage road from South Travis Sreet to near Park Avenue is scheduled to be closed beginning Sept. 1 for crews to work on building theremaining portion of the retaining wall along US 75. The estimated closure time is two months, and traffic is requested to use the US 75 mainlanes during this closure. A reduced speed limit of 60 mph has been set for this construction project.The US 75 pedestrian bridge near Pecan Street in Sherman is closed to pedestrian traffic. The east side over the frontage road has been removed. The remaining pedestrian bridge will be removed later. Pedestrians wishing to cross US 75 are advised to cross at the Houston Streetsignalized intersection.The following roadways in Grayson County will receive a seal coat treatment in the upcoming weeks: US 377 from SH 56 to the Denton County line; FM 922 from the Cooke County line to US 377; SH 56 from Colbert Street in Sherman to the Fannin County line; and FM 406 from SH289 to FM 84. During this time, daytime lane closures will be present as crews work to seal the roadway.FM 1417, Grayson County: from US 82 to SH 56. Watch for lane shifts and shoulder closures between US 82 and SH 56 while crews are working to construct a portion of the new Sand Creek bridge. Watch for occasional daytime lane closures as crews are performing utility work.A reduced speed limit of 45 mph has been set for this construction project.

FM 1417, Grayson County: at the OB Groner / West Travis Street intersection. Watch for occasional lane closures as crews work on installing flashing beacons at the intersection.SH 289, Grayson County: from FM 120 in Pottsboro north to the end of State Maintenance.Watch for daytime lane closures as crews perform pavement repairs and overlay the roadway.FM 691, Grayson County: from FM 131/Loy Lake Road to US 75. Watch for occasional lane closures as workers perform final touch ups on the project. The intersection of FM 691 with FM 131/Loy Lake Road has been converted to a signalized intersection.FM 121, Grayson County: from Jim Jones Road to FM 3356. Watch for daytime lane closures as crews work to widen the roadway to provide a detour section. Watch for lane shifts and narrow lanes near the FM 3356 intersection as crews have moved traffic to the detour section.The ultimate roadway will be a five-lane section when the project is finished.US 377, Grayson County: Willis Bridge at the Oklahoma State line. Watch for occasional lane closures on the existing bridge as workers pour concrete for the new bridge structure.US 75 Ramp Reversal in Denison, Grayson County: on the southbound US 75 main lanes and frontage road between Spur 503 and FM 691. Watch for a lane closure on the southbound US 75 frontage road as well as the westbound Spur 503 ramp while construction crews work onbuilding the new southbound US 75 entrance ramp. A new traffic pattern has been implemented where westbound Spur 503 will be shifted to the southbound US 75 frontage road and will travel through the FM 691 intersection and then enter southbound US 75 using the on-ramp after FM 691.

The new FM 691 exit ramp is now open to access FM 691.US 75 Slope Repair at Randell Lake Road, on the southbound US 75 frontage road between SH 91 and Randell Lake Road, Grayson County: The southbound frontage road and Randell Lake exit ramp have been reopened to traffic as this project is now complete.US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Monday, Wednesday, and Friday during the daytime.US 82 & US 69, Grayson County: from FM 131 to FM 1897 on US 82, and from SH 56 to US 75 on US 69. Watch for temporary daytime lane closures and shoulder closures as workers install safety treatments on fixed objects.US 82, Grayson County: in Sherman from FM 1417 West to FM 1417 East. Watch for nighttime and daytime lane closures as workers repair the concrete pavement.SH 289, Grayson County: between FM 120 and US 82. Watch for daytime lane closures as workers perform pavement repairs.US 69, Grayson County: between SH 56 and SH 11. Watch for daytime lane closures as maintenance crews work on performing base repairs.

US 69, Grayson County: between FM 697 and SH 11. Watch for daytime lane closures as workers perform erosion repairs at the Bois DArc bridge structure.FM 1753, Grayson and Fannin County: from FM 1897 to SH 78. Watch for temporary one-lane closures as workers rehab and widen the roadway. FM 1753 has been reopened to through traffic between FM 1752 and FM 2645 as crews completed the bridge repairs.The following roadways in Fannin County will receive a seal coat treatment in the upcoming weeks: SH 56 from the Grayson County line to SH 121; Spur 311 from SH 56 to SH 121; FM 1396 from SH 56 to FM 2029; FM 273 from FM 2029 to FM 100; FM 100 from FM 273 to FM 79; and FM 79 from FM 100 to the Lamar County line. During this time, daytime lane closures willbe present as crews work to seal the roadway.FM 898, Fannin County: from the Grayson County line to SH 121. Watch for temporary one-lane closures as workers rehab and widen the roadway.FM 2815, Fannin County: from FM 1629 to SH 11. Watch for temporary one-lane closures as workers rehab and widen the roadway.FM 1743, Fannin County: from SH 56 to FM 1550. Watch for temporary one-lane closures as workers rehab and widen the roadway.US 82, Fannin County: from SH 121 to the Lamar County Line. Watch for slow moving construction equipment as crews work on widening US 82 from a two-lane roadway to a four-lane divided section. Westbound US 82 traffic has been shifted to the new pavement on the eastern end of the project between the Fannin and Lamar County line and County Road 2975.Eastbound traffic will remain in their current lane, while crews begin working on the inside lane to work on completing the crossovers and turn lanes. Drivers who frequent this roadway are advised that all driveways, county roads and farm-to-market roads approaching the newwestbound main lanes on US 82 will have a full stop before crossing over to the median. The SH 121 and US 82 frontage road intersections have been converted to a signalized intersection.The on-ramp to westbound US 82 from SH 78 has been closed while crews work on building the new westbound main lanes. Beginning Aug. 20, the westbound exit ramp for SH 121 will be closed as crews work on building the new mainlanes in this area. Exiting traffic for SH 121 is requested to use the SH 78 exit and continue along the frontage road to SH 121.County Road 2250, Fannin County: at Coffee Mill Creek. County Road 2250 is closed for crews to remove the existing bridge and build a new bridge. Traffic on CR 2250 will need to use an alternate route during construction.County Road 3530, Fannin Count: at Wafer Creek. County Road 3530 is closed for crews to remove the existing bridge and build a new culvert. Traffic on CR 3530 will need to use an alternate route during construction.County Road 4250, Fannin County: at Freeman Creek. County Road 4250 is closed for crews to remove the existing bridge and build a new bridge. Traffic on CR 4250 will need to use an alternate route during construction.

FM 896, Fannin County: from SH 78 to Business SH 121: Watch for daytime lane closures as crews work to blade level the roadway.

Sulphur Springs Area (Hopkins, Franklin Counties):Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.SH 11, Hopkins County: From SH 19 to White Oak Creek. Watch for lane closures and short traffic delays as crews perform surfacing operations.SH 19, Hopkins County: From Loop 301 to Delta County Line. Watch for crews installing erosion control devices preparing for safety enhancement work.IH 30, Hopkins & Franklin Counties: From Titus County Line to Hunt County Line. Watch for lane closures and short traffic delays as crews upgrade metal beam guard fence.

Paris Area (Delta, Lamar, Red River Counties)Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co.Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.FM 1507, Lamar County from Church Street to South Collegiate Drive. Watch for temporary lane closures while crews mill existing pavement and place new hot mix.FM 1507, Lamar County from South Collegiate Drive to LP 286.This roadway is closed while crews rehabilitate and re-surface the existing roadway.Loop 286, Lamar County from US 82 West to Dawn Drive. Watch for lane closures while crews perform concrete pavement repair.US 82 (Loop 286), Lamar County Watch for workers as crews perform signal upgrade work.An all-way stop condition will be in place during various phases of this work.SH 37, Red River County from US 271 (Bogata) to Franklin County Line. Watch for daytime lane closures as crews mill existing pavement and place new hot mix.US 82, Red River County from FM 1159 to Bowie County Line. Traffic is shifted to the south side of existing roadway between FM 44 and FM 1699 while crews perform pavement widening work on the north side.FM 195, Red River County from FM 410 North to SH 37. Watch for temporary lane closures while crews upgrade metal beam guard fence and complete cross culvert extensions at two locations.

SH 37, Red River County from the Texas-Oklahoma state line south to the Red River-Franklin County line. Watch for temporary traffic signals at bridge locations while crews upgrade bridge rail from Clarksville to Bogata.Watch for workers while crews perform seal coat operations on various roadways: Lamar County FM 79, & FM 195; Red River County FM 195.

Greenville Area (Hunt, Rains Counties)Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903)455-2303; Rains Co.Maintenance (903) 473-2682.

SH 66, Hunt County: from near FM 6 to near FM 2642. A project to widen the pavement, install continuous left-turn lanes, and safety-treat fixed objects is underway. The contractor is finalizing project clean up. Please be aware of lane closures, and watch for work zones and workers in this area.FM 2194, Hunt County: between Merit and FM 903. This project will widen the shoulders and apply safety treatments to fixed objects. The contractor is currently working on watering, seeding, ditch work and placing signs. Please be careful when traveling in this area.SPUR 264, Hunt County: in Quinlan. Sidewalk improvement project. The contractor is currently seeding and watering, sidewalk construction is complete. Please be careful when traveling in the area and watch out for workers.FM 1566, Hunt County: from FM 272 near Celeste to State Highway 34. The contractor is constructing cross culverts on this roadway. Detours are required to complete this work. Please be careful when traveling in this area and watch out for workers.Hunt County mowing contractors are working at various locations in Hunt County.Hunt County maintenance crews are patching on SH 224 and performing ditch work at various locations in the county; watch for lane closures, work zones and workers along this roadway.Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from these work crews.Rains County maintenance crews are applying hot-mix pavement on SH 276; watch for lane closures, work zones and workers along this roadway. Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from these work crews.Debris and litter operations are ongoing throughout multiple parts of the county. Please be careful when traveling, and watch out for workers.

http://www.txdot.gov | TxDOT on Facebook | TxDOT on Twitter

Read the rest here:
Paris District Road Report for the Week of August 17, 2020 - KSST

Related Posts
August 16, 2020 at 2:53 am by Mr HomeBuilder
Category: Retaining Wall