DISTRICT 27
CUMBERLAND COUNTY I-40 resurfacing from MM 333.5 to the Roane County line (MM 340.4) including SR-299 interchanges: Nightly lane closures on I-40 in both directions from MM 333.5 to MM 340.4. This will take place from 7:00 PM to 6:00 AM (Monday night through Friday morning).
[Rogers Group, Inc./Crossville/CNV315]
CUMBERLAND COUNTY I-40 resurfacing from near Plateau Road (MM 311) to near the Obed River (MM 318): Nightly lane closures on I-40 from near MM 311 to MM 317 working in both directions from 7:00 PM to 6:00 AM. Work consists of resurfacing the asphalt. Daily shoulder closures on I-40 in both directions from near MM 311 to MM 317 from 6:00 AM to 5:00 PM. Work on the shoulders consists of fabricating end walls and pouring concrete. Motorists should use caution when vehicles are entering and exiting the work zone.
[Rogers Group, Inc./Crossville/CNW084]
CUMBERLAND COUNTY SR-28 (S. MAIN ST.) Utility Work southbound at LM 13.5: Shoulder and single lane closures between West Adams Street and Elmo Drive. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 07/26/22 through 07/28/22 from 7:00 am 3:00 pm. [2022-409]
CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): Construction signs and erosion control measures have been installed. The contractor continues grading activities which will include embankment fill, storm drain installation, and placement of graded solid rock. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. Utility relocations for gas, water, sewer, and electric are in progress. Motorists should use caution while traveling through the work zone and be aware of reduced speed zones.
[Jones Bros. Contractors, LLC/Crossville/CNV009]
CUMBERLAND COUNTY SR-282 resurfacing from Dunbar Road (LM 0.0) to SR-101 (LM 3.7): Crews will close one lane while work is being performed. Flaggers will be on site to direct traffic through the work zone. Motorists should use caution when driving through this work zone.
[Tinsley Asphalt, LLC /Crossville/CNW013]
CUMBERLAND COUNTY SR-462 from SR-28 (US-127N / LM 3.1) to SR-298 (Genesis Road / LM 4.6) in Crossville: Interstate Drive has been re-opened from Stout Drive to Genesis Road. The temporary traffic signals at the intersection of Woodlawn Road and Genesis Road are still active. Construction activities are in progress. These activities will require temporary lane closures and/or traffic stoppages on Interstate Drive and Genesis Road as well as short term closures of city streets. The right lane of Genesis Road south is closed from Interstate Drive to north of Woodlawn Road. Crews will be working along Genesis Road.
[Rogers Group, Inc./Crossville/CNV010]
CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): The contractor will be on site beginning utility work along SR-28 in Cumberland County. Motorists are encouraged to use caution and obey posted speed limit signs through the construction zone. The contractor will have equipment and personnel adjacent to the roadway during this work.
[Jones Bros. Contractors, LLC/Moore/CNV300]
DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor continues grading activities throughout the project. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. Motorists should use caution while traveling through the work zone and be aware of construction personnel.
[Twin K Construction/James/CNV012]
DEKALB AND WARREN COUNTY SR-56 construction of bridges and paving from south of Warren-Dekalb County line (LM 24.5) to East Bryant St. (LM 2.9): This week the contractor will shift traffic for SR-288 at the SR-56 intersection on 07/21/22. Motorists should use caution at the intersection of SR-56 and SR-288 and be mindful of the new traffic pattern. There is a traffic shift between LM 24.4 in Warren County through LM 1.0 in Dekalb County. There is a detour in place for Sink Creek Road. Motorists should follow posted signs in the area. The contractor will continue installing concrete box culverts and drainage structures. Grade work, bridge work, and paving operations on the new roadway alignment are ongoing. The contractor is utilizing flagging operations throughout the project in multiple areas for grading operations. Traffic has been shifted onto the detour between SR-288 and Old Blue Springs Road for the contractor to complete grade work in the area. There are several traffic shifts in Smithville City Limits from South College Street to the end of project to allow contractor to complete work. The speed limit has been reduced to 45 mph in the construction zone
[Jones Bros. Contractors, LLC/Harris/CNT011]
OVERTON COUNTY SR-111 safety improvements from west of SR-294 (LM 17.4) to east of Dove Lane (LM 17.9): The contractor is scheduled be onsite continuing work on flashing beacon installation along SR-111. During this work, intermittent lane closures will be used to allow work to occur. Flaggers will be used to facilitate the flow of traffic through the work zone. Motorists are encouraged to use caution through the work zone.
[Mack Construction, LLC/Moore/CNV306]
OVERTON COUNTY SR-85 (HILHAM HWY.) Utility Work both directions from LM 4.52 to LM 3.2: Mobile lane closures along SR-85 between Old Standing Stone Road and Jerry Bilbrey Lane. Motorists should use caution and be aware of personnel and equipment when traveling through the work zone. Signage, cones, and flaggers will be present, 02/17/22 through 07/30/22 from 9:00 AM to 2:00 PM. [2021-457]
OVERTON AND PUTNAM COUNTY SR-84 resurfacing from the Putnam County line (LM 0) to SR-85 (LM 14.8) and then on SR-84 from near Poplar Street (LM 9.8) to the Overton County line (LM 13.4): The contractor has completed resurfacing operations and will be on site intermittently to complete work on pavement markings. During this work, intermittent lane closures may be used to facilitate the flow of traffic. Motorists are encouraged to use caution and be prepared to stop as they approach the work zone.
[Asphalt Paving Systems, Inc./Moore/CNW033]
PUTNAM COUNTY SR-135 (BURGESS FALLS RD.) Utility Work both directions from LM 3.25 to LM 5.57: Shoulder and single lane closures from Cane Creek Road to the intersection of Cookeville Boatdock Road and Burgess Falls Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 02/17/22 through 07/30/22 from 9:00 am 2:00 pm. [2021-771]
PUTNAM COUNTY SR-136 (S. JEFFERSON AVE.) Utility Work southbound from LM 2.385 to LM 2.415: Shoulder and single lane closures from Interstate Drive and S. Walnut Avenue. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 07/19/22 with rain date of 07/27/22 from 10:00 pm 5:00 am. [2022-361]
PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor continues grading activities throughout the project. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities including installation of barrier rail. Utility relocations are in progress. Motorists should use caution while traveling through the work zone and be aware of construction personnel.
[Rogers Group, Inc./James/CNV284]
PUTNAM COUNTY SR-164 (S. Chestnut St) at LM 0.3 and SR-84 (S. Holly St) at LM 9.7 railroad crossing improvements: The contractor has completed installation of new signals. The contractor is scheduled to be on site removing old signal heads and poles. Intermittent lane closures are possible during this work. Motorists are encouraged to use caution through the work zone and watch for construction equipment and personnel adjacent to the roadway.
[Stansell Electric Company, Inc./Moore/CNV072]
PUTNAM COUNTY SR-24 (US-70N) construction at the intersection of SR-56 (LM 11.6) in Baxter: The contractor will be on site continuing Phase 1 construction. During this work, the turning lane from SR 56 northbound onto SR-24 (US-70N) will be closed. Motorists will be allowed to make the right turn from the four-way intersection. The turning lane from SR-56 to 1st Avenue will also be closed; motorists will be allowed to make the right turn from S-56 south. The right turn lane on SR-56 south will also be closed; motorists will be allowed to turn right on SR-24 (US-70N) from the four-way intersection. Motorists are encouraged to use caution through the work zone and to watch for construction equipment and personnel adjacent to the roadway.
[Rogers Group, Inc./Moore/CNV098]
WHITE COUNTY SR-111 (STATE HWY. 111) Utility Work both directions from LM 7.3 to LM 14.2: THP assisted rolling roadblock between Fred Hill Road and O'Conner exit. Message boards, cones, and signage will be present. Motorists should be aware of personnel and equipment, reduce speed and be prepared to stop on 07/24/22 between 6:00 am and 7:30 am, with a rain date of 07/31/22. [2022-348 & 2022-438]
DISTRICT 28
BLEDSOE COUNTY SR-28 (US-HWY. 127) Utility Work southbound from LM 0.01 to LM 9.3: Mobile lane closures along SR-28 between the intersection of US-127 and Kelly lane and the intersection of US-127 and Old Union Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 06/16/22 through 09/15/22 from 9:00 am 2:30 pm. [2022-270]
BLEDSOE AND RHEA COUNTY SR-443 from SR-30 (LM 0) to near New Harmony Rd (LM 3.9) and in Rhea from the county line (LM 0) to SR-30 (LM 6.8): During the day, the contractor will be resurfacing and performing safety improvements at two locations on SR-443 in Bledsoe and Rhea Counties. The SR-443 Bledsoe County location will be from SR-30 (LM 0.00) to Near New Harmony Rd (LM 3.93). The SR-443 Rhea County location will be from the Bledsoe County Line (LM 0.00) to SR-30 (LM 6.87). Traffic will be reduced to one lane controlled by flaggers at each location. Please use caution when driving through the work zones.
[Rogers Group, Inc./Voiles/CNW124]
COFFEE COUNTY I-24 TDOT Bridge Inspection eastbound at MM 109.9: On 07/26/22, there will be single lane closures with an attenuator truck in order to perform bridge inspections. Work will be performed between 9:00 AM and 1:00 PM.
COFFEE COUNTY SR-127 bridge construction over Bradley Creek (LM 4.7): Construction work on this project continues. SR-127 at MM 4.66 will be closed until 09/30/2022 to support bridge construction work over Bradley Creek. A detour route will be provided via Prairie Plains Road and Miller Crossroads Road during construction work, signs and message boards are in place guiding motorists through the detour. Motorists should be alert to the new traffic pattern and encouraged to use caution and be alert to construction personnel and equipment.
[Dement Construction Company, LLC/Hussein/CNV303]
COFFEE COUNTY SR-2 (US-41) repair of bridge over Blue Spring Creek (LM 21.0): Construction work on this project continues. The roadway will be reduced to one lane controlled by a temporary traffic signal. One lane will be open to traffic with the restriction of all wide loads, the maximum lane width is 12. Motorists should be alert to a new traffic pattern and are encouraged to use caution and be alert to construction personnel and equipment.
[Mid-State Construction Company, Inc./Hussein/CNV145]
COFFEE COUNTY SR-55 (NEW MANCHESTER HWY.) Utility Work both directions from LM 11 to LM 12: Shoulder and single lane closures from Royal Trail and Edgewood Drive. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 07/21/22 through 07/27/22 from 9:00 am 11:00 am. [2022-367]
FRANKLIN COUNTY SR-130 resurfacing near High Street (LM 13.2) to near SR-15 (US-64 / LM 14.3): During this reporting period, the contractor will have intermittent lane closures on SR-130 to install construction signs, followed by daily lane closures to perform resurfacing and roadway repair operations. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Tinsley Asphalt, LLC /Hussein/CNW085]
FRANKLIN COUNTY SR-15 (US-41) intersection improvement at University Avenue (LM 27.9): Project activity continues. The roadway will be reduced from four lanes to two lanes. Motorists should proceed with caution through the area and be aware of signage, personnel, and equipment.
[Dement Construction Company, LLC/Hussein/CNV062]
GRUNDY COUNTY SR-2 (US-41) miscellaneous safety improvements at the intersection of SR-50 (LM 1.4): Project activity continues daily with various roadway construction activities being performed. Lane shifts are in place at the intersection of SR2 and SR50. Motorists should proceed with caution through the area and be aware of signage, personnel, and equipment.
[Superior Traffic Control, LLC/Inc./Hussein/CNW082]
GRUNDY COUNTY SR-2 (US-41) TDOT Maintenance both directions from LM 7.2 to LM 7.4: SR-2 is reduced to one lane of traffic due to a slide. Temporary traffic signals are in place.
[TDOT/Maint - Dunlap/MAINT]
MARION COUNTY I-24 (US-64) rockfall mitigation westbound between MM 136.2 and MM 140.3: The contractor will be working on I-24 WB at MM 141 140, MM 139.0 137.0, and MM 136.0 135.0. On Thursday 07/21/22 the contractor will be blasting rock on I-24 WB at MM 136.0 and MM 137.0. This work will require a rolling roadblock to slow traffic down long enough to blast the rock and clean up the road. The roadblock and blasting will begin at 2:00 PM CT and only last as long as it takes to clear the road. Tennessee Highway Patrol and truck mounted attenuators with message boards will be on site during this work. Travel lanes at the remaining sites have been shifted and are open to traffic as usual. Please use caution when traveling through the work zones.
[Wright Brothers Construction Company, Inc./Voiles/CNV912]
MARION COUNTY I-24 resurfacing from west of Martin Springs Road Exit (MM 141) to east of Big Fiery Gizzard Creek (MM 146): The contractor will continue resurfacing operations on I-24 from MM 140.8 (West of the Martin Springs Rd exit) to MM 146.0 (East of Fiery Gizzard Creek). Work will occur Sunday through Friday from 7:00 PM 6:00 AM each night. Work will take place in both directions and will close one lane at a time. Tennessee Highway Patrol and a truck mounted attenuator with message board will be on site each night.
[Rogers Group, Inc./Voiles/CNV314]
MARION COUNTY I-24 TDOT Contractor both directions from MM 161 to MM 166.6: On 07/24/22 and 07/25/22, lane one will be closed for pavement testing and analysis from 6:00 PM central time to 6:00 AM central time between the Nickajack Lake Bridge and the Georgia State Line. Rain dates are 07/26 and 07/27 for this work.
MARION COUNTY SR-2 (US-HWY. 41) TDOT Maintenance both directions from LM 25.7 to LM 26.0: SR-2 is reduced to one lane with temporary traffic signals. Ongoing slide repair project below the roadway requires this closure.
MARION COUNTY SR-27 between LM 26.9 and LM 27.9 slide repair and bridge and retaining wall construction: The contractor will be working on SR-27 (Suck Creek Road) at LM 26.9 and LM 27.9 to construct a new bridge and repair a slide. Both work zones, at LM 26.9 and LM 27.9, have the travel lanes reduced to one lane controlled by temporary traffic lights. Also, at LM 26.9 there will be intermittent road closures controlled by flaggers for the safety of drivers when trees are being cut down. Please use caution when traveling through each work zone.
[Dement Construction Company, LLC/Voiles/CNV307]
SEQUATCHIE COUNTY SR-28 (US-127) Utility Work southbound from LM 9.31 to LM 11.16: Mobile lane closures along SR-28 between the intersection of US-127 and Kelly lane and the intersection of US-127 and Old Union Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, cones, and flaggers will be present, 06/16/22 through 09/15/22 from 9:00 am 2:30 pm. [2022-270]
DISTRICT 29
BRADLEY COUNTY I-75 resurfacing from north of SR-311 (US-74 / MM 21) to north of SR-60 (MM 25.5): During this reporting period, the contractor will have weekend closures on I-75 SB at MM 21.6 to perform bridge repairs. Beginning at 7:00 PM on Friday 07/22/22 through 6:00 AM Monday 07/25/22 the left lane of I-75 southbound will be closed. Motorists are advised to expect delays in the area and reduce speed in the work zone. Following the weekend bridge work, nightly lane closures will be in place Sunday through Thursday 7:00 PM to 6:00 AM to support resurfacing operations.
[Talley Construction Company, Inc./Wagner/CNW045]
BRADLEY COUNTY SR-2 (US-11) resurfacing from Old Highway 11(LM 18.2) to near the Hiwassee River (LM 20.9): During this reporting period, the contractor will have brief intermittent lane closures on SR-2 (US-11) to install construction signs. Shoulders and sidewalks will also be closed through Charleston for curb ramp upgrades. Motorists are asked to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Wright Brothers Construction Company, Inc./Wagner/CNW158]
BRADLEY COUNTY SR-312 (HARRISON PK.) TDOT Maintenance both directions from LM 3.1 to LM 3.2: During this reporting period, TDOT maintenance forces may have temporary lane closures on SR-312 between the hours of 8:00 AM and 5:00 PM to continue repair work on a storm drainpipe. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[TDOT/Maint - Benton/MAINT]
BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will be performing earthmoving operations, utility relocation and storm drainage installation. Crews will also be working on foundations for a new bridge over Candies Creek. Motorists are advised to reduce speed in the work zone, watch for flaggers assisting with traffic control and for trucks entering/leaving the highway. Speed limit through work zone will be reduced from 45 MPH to 35 MPH.
[Summers-Taylor, Inc./Wagner/CNV130]
HAMILTON COUNTY I-24 interchange improvement at SR-2 (US-11, US-41, US-72, Broad Street) and SR-58 (Market Street): Williams Street is closed to all traffic at the I-24 underpass to support the installation of new storm drainage structures for the new frontage road. Traffic will still be able to access the ramps to I-24 and US-27, but no through traffic will be allowed on Williams Street between West 21st Street and West 25th Street. Traffic will detour around the closure via West 21st Street and Broad Street. Signs will be posted. The contractor will be working on new bridge construction, storm drainage structures, and utility relocation. Chestnut Street is closed at the I-24 underpass and will remain closed until the construction of bridge #2 is complete. Detour routes are posted. The US-27 NB on-ramp at William St. has been closed and it will be closed until the new alignment for this ramp is completed. There will be marked detour signs to use the Broad St. US-27 on-ramp.
[Wright Brothers Construction Company, Inc./Curtis/CNU011]
HAMILTON COUNTY I-75 concrete repair from MM 6.6 to MM 12.8: During this reporting period, the contractor will close two lanes on I-75 North between MM6.6 and 12.6. Starting on Friday July 22nd at 9:00 PM thru Monday July 25th at 6:00 AM, the contractor will have the two outside lanes closed on I-75 North from MM 6.6 to MM9.8 and will shift traffic to the inside shoulder and the inside lane as the contractor removes certain sections of the concrete roadway and pours it back this weekend. There will be two lanes of traffic open during weekends operation. It is recommended that the motoring public use alternate routes through this area because there will be a possibility of long wait times. During this reporting period, the contractor will be having lane closures in both the Northbound and Southbound directions on I-75 from 9:00 PM 6:00 AM.
[Summers-Taylor, Inc./Curtis/CNW046]
HAMILTON COUNTY SR-2 (BROAD ST.) Utility Work southbound from LM 7.04 to LM 7.16: Shoulder and single lane closures between W. 26th Street and W. 19th Street. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 07/26/22 from 9:00 am 2:00 pm, with a rain date of 07/27/22. [2022-427]
HAMILTON COUNTY SR-2 (E. 23RD ST.) Utility Work both directions from LM 9.1 to LM 9.7: Center lane closure on E. 23rd Street S. Holly Street to S. Willow Street. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 07/18/22 through 07/29/22 from 10:00 pm 5:00 am. [2019-543]
HAMILTON COUNTY SR-29 (US-27) slide repair between LM 29 and LM 30: The travel lanes on US-27/SR-29 in Hamilton County between LM 29 and LM 30 will be reduced to one lane of traffic in each direction for the duration of the slide repair. Loads over 14 wide will have to find an alternate route. [TDOT/Wallace/Maint] RESTRICTIONS: Loads over 14 wide will have to find an alternate route.
[GeoStabilization International, LLC /Maint - Chattanooga/MAINT]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, to install power poles and transfer lines. The flagging operations will be performed on 07/21/22, 07/22/22, 07/25/22, 07/26/22, and 07/27/22 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for utility work, delivery of materials and equipment. A portion of Tucker Road has been closed from Spalding Drive to 5400 Tucker Road to allow for grading and utility operations. Flagging will be required on Spalding Drive for bridge one operations.
[Wright Brothers Construction Company, Inc./Osbonlighter/CNT336]
HAMILTON COUNTY SR-319 (Amnicola Highway) bridge repair over SR-153: The contractor will be performing bridge repair operations on the Amnicola (SR-319) bridge over SR-153. During this project, SR-319 will have lane closures in place. During repair operations at least one lane of traffic will remain open in both directions. Bridge repair over SR-153 will be performed between 6:00 am & 6:00 pm. In addition, nightly work will be performed between 7:00 pm & 6:00 am from 07/25/2022 to 07/29/2022. Motorists are advised to use caution in this vicinity and remain aware of construction activities.
[Mid-State Construction Company, Inc./Osbonlighter/CNV053]
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 1.96: Shoulder and single lane closures at the roundabout of Ooltewah Ringgold Road and Standifer Gap Road. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 05/26/22 through 07/27/22 from 10:00 am 2:00 pm. [2021-782]
HAMILTON COUNTY SR-58 slide repair near LM 17: During this reporting period, the contractor will have SR-58 North at LM 17 reduced to one lane for the duration of the project.
[Talley Construction Company, Inc./Curtis/CNW199]
HAMILTON COUNTY SR-8 (CHEROKEE BLVD.) Utility Work southbound from LM 10.63 to LM 11: Shoulder and single lane closures on Cherokee Blvd from W. Bell Avenue to Gurley Street. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 07/14/22 through 07/27/22 from 9:00 am 2:00 pm. [2022-302]
HAMILTON COUNTY SR-8 (TAFT HWY.) Utility Work both directions from LM 22.01 to LM 22.2: Shoulder and single lane closures between Fairmount Road and Dowler Lane. Motorists should reduce speed and be prepared to stop. Signage, cones, and flaggers will be present, 02/15/22 through 07/27/22 from 9:00 am 2:00 pm. [2021-636]
HAMILTON COUNTY SR-8 (US-41, US-76) Bachman Tubes cleaning: On Thursday night of this reporting period, the contractor will close the tunnels from 8:00 PM 6:00 AM for cleaning. There will be a signed detour for traffic to follow to navigate around the closure.
[Diamond Specialized, Inc./Curtis/CNW197]
HAMILTON COUNTY The construction of an S.I.A. to VW: The contractor will be performing operations at the intersection connecting the S.I.A. route, Ferdinand Piech Way, & Volkswagen Dr. The new 4-way signalized intersection has begun operation & traffic has been shifted to the new alignment. Ferdinand Piech Way will still be closed to through traffic. Drivers should be cautious of the new traffic pattern in effect including a lowered speed limit. Drivers should also be alert to the entrance and exit of construction vehicles & staff on and around the jobsite and the connecting roadways. Flaggers may be onsite directing traffic.
[Talley Construction Company, Inc./Osbonlighter/CNU221]
MCMINN COUNTY SR-163 resurfacing from near SR-2 (US-11 / LM 2.5) to west of County Road 750 (LM 8.9): During this reporting period, the contractor will have daily lane closures from 7:00 AM to 7:00 PM to perform resurfacing and roadway repair operations. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
[Wright Brothers Construction Company, Inc./Wagner/CNW112]
MCMINN COUNTY SR-307 resurfacing from north of Tellico Avenue (LM 1.9) to the Monroe County line (LM 8.5): Starting this reporting period, the contractor will have intermittent lane closures on SR-307 during the day. There will be flaggers and possible pilot cars directing traffic as the contractor works.
[Rogers Group, Inc./Curtis/CNW126]
MEIGS COUNTY SR-304 repair of bridge over Big Sewee Creek (LM 4.8): The contractor will be performing bridge repair operations on the SR-304 bridge over Big Sewee Creek. During this project, SR-304 will have lane closures with 10 ft width restrictions. A detour will be in place redirecting SR-304 truck traffic onto Watts Bar Hwy & SR-58. During repair operations, only one lane of traffic will remain open for local traffic. A temporary traffic signal will be in place to direct traffic thru the construction zone.
[Mid-State Construction Company, Inc./Osbonlighter/CNV305]
MEIGS COUNTY SR-58 resurfacing from east of the Hiwassee River (LM 5.8) to east of Roberts Road (LM 15.3): During this report period, the contractor will have intermittent lane closures while performing resurfacing operations. Flaggers will be on-site to assist traffic flow. Drivers should be aware of construction vehicles entering and exiting the work-zone.
[Rogers Group, Inc./Osbonlighter/CNW130]
POLK COUNTY SR-40 (US-64) bridge over the Ocoee River: During this reporting period, the contractor will be working on reconstruction of side streets and removal of the old bridge over the Ocoee River. Intermittent lane closures are possible for moving equipment across US-64 (SR-40). Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control.
Here is the original post:
Roadway Activity Report for parts of East and Middle Tennessee (July 21 - 27, 2022) - tn.gov
- All American Paving Revolutionizes Driveways with Sustainability and Style - MyChesCo - December 21st, 2024 [December 21st, 2024]
- Paving the Future: American Paving Sets New Standard for Sustainable and Resilient Infrastructure in Charlotte, NC Area - Benzinga - December 21st, 2024 [December 21st, 2024]
- RH Paving Brings Noise-Reducing Asphalt Technology to Glen Mills - MyChesCo - December 21st, 2024 [December 21st, 2024]
- West Orange Resident Warns Others About Driveway Paving Scam - TAPinto.net - October 9th, 2024 [October 9th, 2024]
- Southern Indiana Asphalt Paving Expands Services for Residential and Commercial Clients in New Albany, IN - openPR - October 9th, 2024 [October 9th, 2024]
- Next section of paving work on Shannon Lake Road begins - News Talk Sports AM 1150 - October 9th, 2024 [October 9th, 2024]
- Asphalt paving to begin in McCann Heights, 3 roadways to close Sept. 6 - County 17 - September 7th, 2024 [September 7th, 2024]
- I tried Newman and Cole's long-handle weed brush from Amazon and it made paving block weeding a breeze - Yahoo Lifestyle UK - September 7th, 2024 [September 7th, 2024]
- Apopka FL Asphalt Paving Team Enhances Local Infrastructure with Top-Notch Services - openPR - September 7th, 2024 [September 7th, 2024]
- HALS HEADLINES: Paving scammers operating in Manitoba - Winnipeg Sun - August 17th, 2024 [August 17th, 2024]
- Driveway Sealing Residential Paving & Crack Filling Services | Toronto - August 20th, 2022 [August 20th, 2022]
- Driveway Paving Alternatives: A Guide to Selecting a Better Driveway ... - August 20th, 2022 [August 20th, 2022]
- Asphalt Paving Thickness - Is 2 Inches Enough for a Driveway? - August 20th, 2022 [August 20th, 2022]
- Road closures this weekend for I-70 interchange paving, work begins on pedestrian access improvements to MD-26 Liberty Road - Baltimore Sun - August 20th, 2022 [August 20th, 2022]
- AOT Road Construction Report Week of August 22 - Vermont Biz - August 20th, 2022 [August 20th, 2022]
- Laying a New Pavement: How to Find the Best Paving contractor near me - My MMA News.com - August 20th, 2022 [August 20th, 2022]
- Maplewood Police Seek Persons of Interest in Alleged Driveway Sealing Scam - The Village Green - August 20th, 2022 [August 20th, 2022]
- Josh Berthiaume Helps Homeowners Seal Their Improvements - Business West - August 20th, 2022 [August 20th, 2022]
- Overnight Work on Route 322 Project Near Philipsburg Rescheduled - GANT News - August 20th, 2022 [August 20th, 2022]
- Parking improvements offered to North Central | Local News | smdailyjournal.com - San Mateo Daily Journal - August 20th, 2022 [August 20th, 2022]
- Shelton approves 30 apartments on Old Bridgeport Ave. - CTPost - August 20th, 2022 [August 20th, 2022]
- How to remove oil stains from a driveway - 4 budget hacks to instantly dissolve grease - Express - August 20th, 2022 [August 20th, 2022]
- Tourism, housing crisis contributing to increased trash in downtown Charlottetown - Saltwire - August 20th, 2022 [August 20th, 2022]
- 54% of drivers want to switch to electric cars within the next 5 years, but confusion around home charging costs could be holding them back - Centrica - August 20th, 2022 [August 20th, 2022]
- Glasgow Resin Driveways LTD Enjoy Rave Reviews Across The Glasgow Area - Digital Journal - July 26th, 2022 [July 26th, 2022]
- Kingsport to start preservation paving in Lynn Garden - Kingsport Times News - July 26th, 2022 [July 26th, 2022]
- Paving Work To Affect City Avenue Traffic This Week - Patch - July 26th, 2022 [July 26th, 2022]
- Business of the Week: Vestal Asphalt - WIVT - NewsChannel 34 - July 26th, 2022 [July 26th, 2022]
- Erskine Street Paving Complete 48 Kilometres of Improvements and Counting in 2022 - City Of Windsor - July 26th, 2022 [July 26th, 2022]
- Reader takes issue with ordinance | Letters to the editor | coastalpoint.com - Coastal Point - July 26th, 2022 [July 26th, 2022]
- Larchmont Road Paving Work Will Add Some Excitement To The Workweek - Patch - July 26th, 2022 [July 26th, 2022]
- Obici hospital is repaving parking lots this summer - The Suffolk News-Herald - Suffolk News-Herald - July 26th, 2022 [July 26th, 2022]
- Block Paving Market Size, Share 2022 Analysis by Demand Status, Growth Outlook by Regional Segments, Top Companies and Dynamics Forecast to 2030 -... - July 26th, 2022 [July 26th, 2022]
- Asphalt Additives Market Secret Factors Behind the Growth in New Research On Top Players 2021-2031 Travel Adventure Cinema - Travel Adventure Cinema - July 26th, 2022 [July 26th, 2022]
- Graves: Expect Infrastructure Costs & Inflation to Get Worse - For Construction Pros - July 26th, 2022 [July 26th, 2022]
- Women of Asphalt Return to In-Person World of Asphalt in Nashville : CEG - Construction Equipment Guide - January 25th, 2022 [January 25th, 2022]
- I-65 in Robertson Co. Narrowed to One Lane in Both Directions for Emergency Paving - tn.gov - January 25th, 2022 [January 25th, 2022]
- Etowah Mega Sports Authority waiting for work to resume; play date still up in the air - Gadsden Times - January 25th, 2022 [January 25th, 2022]
- TxDOT Project Updates for the Week of Jan. 24, 2022 - Texas Department of Transportation - January 25th, 2022 [January 25th, 2022]
- Road brining before winter storms is gaining more traction around Philly and the nation - The Philadelphia Inquirer - January 25th, 2022 [January 25th, 2022]
- Talking Tires: Differences Between All-Season, All-Weather, Snow, and All-Terrain Rubber - GearJunkie - January 25th, 2022 [January 25th, 2022]
- Tesla Cybertruck spotted being offloaded in Gigafactory Texas - Teslarati - January 25th, 2022 [January 25th, 2022]
- Global Asphalt Surfactant Additives Market Precise Scenario Covering Trends, Opportunities and Growth Forecast during 2021 to 2027 Discovery Sports... - January 25th, 2022 [January 25th, 2022]
- No stormwater work in Commerce Street and S. 9th St. intersection this weekend - soundtransit.org - February 20th, 2021 [February 20th, 2021]
- Pavement Maintenance Industry Urges a Stop to Maryland HB 77 - ForConstructionPros.com - February 20th, 2021 [February 20th, 2021]
- ACI Asphalt & Concrete named 2021 Contractor of the Year by Pavement Magazine - ForConstructionPros.com - February 20th, 2021 [February 20th, 2021]
- The Snow Angels Of West Allis Help Elderly And Disabled Property Owners - WUWM - February 20th, 2021 [February 20th, 2021]
- Road crews battle the weather to keep the city moving - YourErie - February 20th, 2021 [February 20th, 2021]
- Nascar Rookie Brings Another Major Sponsor To The Cup Series - Forbes - February 20th, 2021 [February 20th, 2021]
- No stormwater work in Commerce and S. 9th St. intersection this weekend. Track install starts on Commerce on Feb. 22 - The Suburban Times - February 20th, 2021 [February 20th, 2021]
- Getting to the nut of the jobs market | What's Working | unionleader.com - The Union Leader - February 20th, 2021 [February 20th, 2021]
- Brick Pavers Market 2020 Global Overview By Size, Share, Trends, Growth Factors and Leading Players With Detailed Analysis of Industry Structure The... - February 20th, 2021 [February 20th, 2021]
- Tested: 1981 AMC Eagle SX/4 Sport Goes Where Most Cars Can't - Car and Driver - February 20th, 2021 [February 20th, 2021]
- Residential and secondary streets still filled with snow - wcia.com - February 20th, 2021 [February 20th, 2021]
- The City of Chicago Urges Residents To Take Precautions Around Flooding, Falling Ice and Other Dangers Associated With Melting Snow | The Crusader... - February 20th, 2021 [February 20th, 2021]
- Road project on Route 78 in Escondido begins this month - The San Diego Union-Tribune - February 20th, 2021 [February 20th, 2021]
- Common Orthopedic Injuries in Winter - Integris - February 20th, 2021 [February 20th, 2021]
- Street Department putting in overtime - Arkansas Online - February 20th, 2021 [February 20th, 2021]
- Seal Coatings Market 2021 Size, Status and Global Outlook GuardTop, Surface Protection Services, Seal Master Corporation, Vance Brothers, Neyra... - February 20th, 2021 [February 20th, 2021]
- City of Lawton prepping for new street projects in the new year - The Lawton Constitution - January 5th, 2021 [January 5th, 2021]
- The Benefits of a Stamped Concrete Driveway - EndZoneScore - January 5th, 2021 [January 5th, 2021]
- Global Pavers for Building Market to 2026 Industry Perspective, Comprehensive Analysis, and Forecast - The Courier - January 5th, 2021 [January 5th, 2021]
- Gravel Paver Market : Industry Analysis and forecast 2027: Type, Application, and Region. - LionLowdown - January 5th, 2021 [January 5th, 2021]
- Wild Turkeys Playing Chicken with the Traffic in Mississauga - Wheels.ca - January 5th, 2021 [January 5th, 2021]
- Best Car To Buy 2021: How we named the Chevrolet Corvette our winner - Motor Authority - January 5th, 2021 [January 5th, 2021]
- Boston Road Design Public Hearing In Westford Town - Patch.com - January 5th, 2021 [January 5th, 2021]
- Crack sealing operations to continue in GC; other road projects - Sherman Denison Herald Democrat - January 5th, 2021 [January 5th, 2021]
- VIDEO: Mum shocked as driver skids on icy street while her children play - Swindon Advertiser - January 5th, 2021 [January 5th, 2021]
- Iowa City Reminds Residents That Sidewalks Should Be Cleared Within 24 Hours Of Snowfall - Patch.com - January 5th, 2021 [January 5th, 2021]
- How crews clear the snow that makes Steamboat so famous - Steamboat Pilot and Today - January 5th, 2021 [January 5th, 2021]
- The Space Surrounding This House Makes It a Rare Real-Estate Find in a Place Like Ventnor - Press of Atlantic City - January 5th, 2021 [January 5th, 2021]
- A Pandemic of Good News: The Top 50 Positive Stories of 2020 - Good News Network - January 5th, 2021 [January 5th, 2021]
- The 5 Best Snow Blowers To Buy in 2021 - The Manual - January 5th, 2021 [January 5th, 2021]
- Girl Scouts Heart Of New Jersey Continues To Be Pillar Of Support - Patch.com - January 5th, 2021 [January 5th, 2021]
- He understood the bigness of love - The News International - January 5th, 2021 [January 5th, 2021]
- Their view: Salts effects on waterways not very nice - Wilkes Barre Times-Leader - January 5th, 2021 [January 5th, 2021]
- Santa Barbara and Its Trees - Santa Barbara Edhat - January 5th, 2021 [January 5th, 2021]
- No connection between apples on walls and crime say police - In Your Area - January 3rd, 2021 [January 3rd, 2021]
- Smokey Is Bridgewaters Pet Of The Week - Patch.com - January 3rd, 2021 [January 3rd, 2021]
- Year In Review: Top Warminster News Of 2020 - Patch.com - January 3rd, 2021 [January 3rd, 2021]