Driveway Paving; Step 1, Step 2

For this part of the driveway paving a base layer will be applied by workers from Driveway Paving Guys; this will be at least two inches thick. Two inches is necessary to make sure that your driveway can support the weight of your car.

After the base layer is done the final step in paving a driveway is the top layer and is half a inches thick. The crucial thing here is to make sure that the proper asphalt mix is used. Driveway Paving Guys agrees that broadly speaking two classes of asphalt that can be used when laying a driveway paving, class one is applied for the base while class two is applied for the top. There are a lot of various mixtures within the two classes and the right one will hinge mainly on where you live. For this you are largely going to have to trust our contractor to know as we rely on our experience and qualified skill to use the proper asphalt. We only employ qualified and experienced staffs that have completed all required training to for us to be successful in all projects that we choose to undertake.

Last thing for a Driveway Paving

The last thing that Driveway Paving Guys will make sure is included in the bid that you receive is the slope of the driveway to allow for drainage. You don't desire water pooling in the centre of your driveway paving that we installed here. So the slope will run down from the centre towards the sides. Generally a slope of a quarter inch for each foot of distance is ideal. Our contractor will know the proper slope but if you want to make sure that this is included in the bid please call us on 888-487-8118.

View original post here:
Driveway Paving Guys | Call 888-487-8118

Related Posts
November 24, 2016 at 8:50 am by Mr HomeBuilder
Category: Driveway Paving