Home » Demolition » Page 171
Babri Masjid Demolition Case : Petitioner Md Hasim Ansari to drop Case
Watch T News LIVE the 24/7 Telugu news channel now on youtube. The first Telangana news channel featuring best news from all around the world. We deliver bre...
By: T News
Read more from the original source:
Babri Masjid Demolition Case : Petitioner Md Hasim Ansari to drop Case - Video
Category
Demolition | Comments Off on Babri Masjid Demolition Case : Petitioner Md Hasim Ansari to drop Case – Video
Hasim Ansari sensational comments on Central Government - Babri Masjid Demolition Case
Babri Masjid Demolition Case - Petitioner Md Hasim Ansari made sensational comments on central government that this government is unfavorable to Muslims and ...
By: T News
Read the original post:
Hasim Ansari sensational comments on Central Government - Babri Masjid Demolition Case - Video
Category
Demolition | Comments Off on Hasim Ansari sensational comments on Central Government – Babri Masjid Demolition Case – Video
Wall stadium turkey demolition derby 11/30/14
By: FlipperDoe
See more here:
Wall stadium turkey demolition derby 11/30/14 - Video
Category
Demolition | Comments Off on Wall stadium turkey demolition derby 11/30/14 – Video
Petition dismissed on protests of the anniversary of babri masjid demolition
The Chennai High Court dismissed the petition filed by the general secretary of Hindu Munnetra Kazhagam, Mr. Gopinath seeking to ban protests by Muslim outfits to mark the demolition of the...
By: Puthiya Thalaimurai TV
See the original post:
Petition dismissed on protests of the anniversary of babri masjid demolition - Video
Category
Demolition | Comments Off on Petition dismissed on protests of the anniversary of babri masjid demolition – Video
DIXIE CHALLENGER DEMOLITION DERBY 5 PACK HOT WHEELS
Hot Wheels toy car.
By: JASON
View post:
DIXIE CHALLENGER DEMOLITION DERBY 5 PACK HOT WHEELS - Video
Category
Demolition | Comments Off on DIXIE CHALLENGER DEMOLITION DERBY 5 PACK HOT WHEELS – Video
CS:GO Demolition Scout Round (Stream Highlight)
Follow me on Twitter: https://twitter.com/TheG18 Spreadshirt: http://theg18.spreadshirt.com/ Twitch: twitch.tv/TheG18 The Crew SideArms: http://www.youtube.com/user/SideArms4Reason Deluxe4:...
By: G18SprayAndPray
See the original post here:
CS:GO Demolition Scout Round (Stream Highlight) - Video
Category
Demolition | Comments Off on CS:GO Demolition Scout Round (Stream Highlight) – Video
Far Cry Outpost Demolition – Video -
December 5, 2014 by
Mr HomeBuilder
Far Cry Outpost Demolition
By: Sam Wheway
Read the original post:
Far Cry Outpost Demolition - Video
Category
Demolition | Comments Off on Far Cry Outpost Demolition – Video
When theater fans arrive at the new Dr. Phillips Center for the Performing Arts to see "The Phantom of the Opera" tonight, they'll likely marvel at the gleaming, $514 million building's beauty.
But the beauty has a blemish that city officials didn't count on: the skeletal remains of the "Round Building," which should have been torn down by now. Instead, the half-demolished building is still there, as welcome as a skunk at a wedding.
There are several reasons the demolition is behind schedule, including the firing of the supervisor in charge of the job site after it was revealed he'd been shooting an assault rifle inside the building.
Regardless, everyone is tired of the gutted building marring the postcard-perfect view of the arts center as it did during the long-awaited ribbon-cutting last month, the celebratory outdoor Sheryl Crow concert that followed, the community open houses, and now through the first Broadway tour.
"I don't know if 'frustrated' is the word, but I'll be happy when it's down," Mayor Buddy Dyer said.
The city has the authority to levy $500 a day in fines against the contractor, Lakeland-based Crusader Demolition, though that decision hasn't been made.
The work was running behind even before it started. Though the City Council selected Crusader Demolition for the job in June, they didn't sign a contract until Aug. 4.
Even then, the work couldn't start immediately because the Dr. Phillips Center's staff had its offices in the otherwise vacant Round Building. City inspectors hadn't issued a certificate of occupancy for the arts center, and the workers couldn't move out until that happened.
The contractor started working in early September. The building couldn't be imploded, and picking it apart with heavy equipment and torches was even more slow going because of its history.
The two-story American Federal Building was built in 1963, an example of midcentury-modern architecture. Five additional floors were later added, bringing it to seven stories and 70,000 square feet.
Read more here:
Slow demolition of 'Round Building' mars new arts center
Category
Demolition | Comments Off on Slow demolition of 'Round Building' mars new arts center
With good planning, it is possible to promote the reuse of construction and demolition waste and thereby both conserve the environment and save on material costs. In the future, it will be even more important to assess how buildings can reasonably be repaired or demolished into parts, together with how the remaining service life of the parts can be utilized in new applications. The best method is to implement demolition planning already as a component of construction design.
Reuse of construction parts is always worthwhile from the perspective of the environment, and can also be considerably cheaper than using secondary raw materials. The production of building materials and construction itself are, together with energy consumption during the usage stage, the most significant factors associated with building stock that cause environmental load.. By reusing salvaged parts, the embodied energy equivalent to that required in the manufacture of the new product is retained as well as their economic and cultural value.
The current focus in basis of design is easy and efficient constructability, but in the future the designer shall to assess how buildings can sensibly be repaired or deconstructed into parts and how to utilize the remaining service life of those parts in new applications. In addition, the use of natural resources will be optimized in the manufacturing processes used for building materials and products, and recyclable materials will be favoured.
In practical construction, planning for the purpose of reuse and recycling is seen in accordance with the requirements in configurable or modular solutions in which the structures and materials are long-lasting and easily reclaimed. With good planning, the maintainability and repair potential of buildings and building service technology can be facilitated and the expenses incurred reduced.
The best way to promote the reuse and recycling of salvaged building parts is to introduce a demolition plan already into the further planning associated with the project. It should be an essential component in the design concerning the management of the life cycle of buildings and structures. In the demolition plan, it is important to assess the material quantities that can be utilized in various ways, as well as the demolition methods available.. These are currently presented only when applying for a permit to demolish a building.
VTT Technical Research Centre of Finland studied the reuse of structural elements in the ReUSE (Repetitive Utilization of Structural Elements) project, which recently ended. VTT also proposes the development requirements for improving the planning linked with demolition and repair. Of these, the most pivotal are the development of the guidelines and legislation supporting reuse, in addition to showing, by means of example targets, the commercial and ecological benefits that can be obtained.
The research is connected with the Ministry of the Environment's Green Economy programme. The ReUSE project has been funded not only by the Ministry of the Environment but also by Finnish Wood Research Oy, Ekokem Oy, VTT Technical Research Centre of Finland and Tampere University of Technology.
Story Source:
The above story is based on materials provided by Technical Research Centre of Finland (VTT). Note: Materials may be edited for content and length.
See original here:
Demolition planning as part of construction: Reuse and recycling of parts improves the eco-efficiency of buildings
Category
Demolition | Comments Off on Demolition planning as part of construction: Reuse and recycling of parts improves the eco-efficiency of buildings
Contractor took scrap for free -
December 5, 2014 by
Mr HomeBuilder
THE demolition of the old Cebu City Medical Center (CCMC) costs P7.65 million and the contractor who undertook the demolition works took the scrap from the building.
The demolition was done at no cost to the City Government.
This was disclosed by the Department of Engineering and Public Works (DEPW) during the City Councils executive session yesterday that seeks to determine who took custody of the scrap materials from the CCMC.
In appearing before them, DEPW Chief Engr. Jose Marie Poblete told the legislative body that the P7.65 million covers the JLC Constructions supply of labor for the demolition of the hospital, the equipment used and other demolition works, such has hauling and disposal of the debris.
The rubble from the CCMC were dumped along the road leading to the City Hall block in the South Road Properties and in Pond A.
The contractor, Poblete said, deployed at least 100 personnel for the demolition as well as three big backhoes and 10 ten-wheeler trucks among others.
Recovered
After the demolition works, the contractor recovered P1.86 million worth of materials.
Based on the report the contractor submitted, they included rollable wires (20.8 kgs.), rebars (37.1 kgs.), grilles (23.8 kgs.), and assorted scrap (32.3 kgs.) among others.
Poblete said the materials that the contractor recovered were taken by as a form of defraying the cost they have incurred in demolishing the CCMC at no cost to the City.
View original post here:
Contractor took scrap for free
Category
Demolition | Comments Off on Contractor took scrap for free
« old entrysnew entrys »