Categorys
Pages
Linkpartner


    Page 33«..1020..32333435..4050..»



    Richard L Sensenig makes Stainless Steel Tanks for Custom Applications - June 15, 2014 by Mr HomeBuilder

    Richard L Sensenig, located in Ephrata, PA, is a custom metal fabricator servicing industry since 1958. We provide a wide range of industrial and commercial services including Custom Metal Fabrication, Sheet Metal Fabrication and Roofing. We work with Steel, Stainless Steel and Aluminum, iron, lead, light metals, copper, and architectural metal. Our custom metal fabrication services do not stop once your piece is completed; we handle finishing, assembly, painting, structural steel erection, and more.

    A recent project was for a Specialty Chemical Manufacturer who needed an above-ground 1800 gallon tank for mixing chemicals. The tank was made with 304 stainless Steel, with " thick plate, an ASME flanged and dished head at the top and a cone bottom. We also welded access nozzles through the top for connection with the agitator, fill lines and instrumention and a manway on the side for easy access and cleaning.

    Our on-time delivery of this project project was designed by us and installed by the customer, but we do offer installation for customers as a value-added service.

    About Richard L Sensenig: Richard L Sensenig has built a strong reputation on a commitment to modern technology and good, old-fashioned craftsmanship. Above all, we go out of our way to serve our customers in an honest, dependable and professional manner.

    We specialize in the food service industry, and we also serve customers from the industrial, agricultural, food, wastewater, environmental, material handling and other sectors.

    When you choose Richard L. Sensenig Company, you can trust the job is done right, on schedule, and at a reasonable price. For more information, please call (717) 733-0364 or visit our website http://www.rsensenig.com.

    Continue reading here:
    Richard L Sensenig makes Stainless Steel Tanks for Custom Applications

    Courthouse design team could handle PR for county board - June 11, 2014 by Mr HomeBuilder

    JOLIET An architectural firm hired by the county earlier this year to plan a new courthouse could also handle public relations for an additional cost, under a scope of services outlined Tuesday to a county board committee.

    The Capital Improvements Committee on Tuesday approved the Darien-based Wight & Co.s preliminary design work, which carries a $1.3 million price tag. Building a new courthouse could cost between $140 and $200 million.

    The companys work includes a concept plan, cost estimates, county population projections and tours of other courthouses. The county also has the option of tacking on other services such as public relations and communications, additional presentations and site due diligence.

    There had been previous talks by committee members to also include a study of the potential for commercial space, such as a cafeteria, coffee shop or public area, but documents presented Tuesday did not include that.

    In regards to public relations and communications, the company recommend working with the county to develop an initial communications plan and establish a consistent message for all county leadership and board members to have when representing the project.

    The county would allow the company a $100,000 budget for public relations, according to documents presented Tuesday. A $50,000 budget was included for additional presentations and possible site due diligence.

    The company also budgeted $93,500 in reimbursable expenses, including costs for printing, supplies relating to reports and presentations, travel and lodging expenses and mileage reimbursement, bringing total costs of planning to about $1.3 million.

    The team also will look into the logistics of having satellite court locations in the northern and eastern portions of Will County to address long-term judicial needs. Another priority is looking into the courthouses need for state-of-the-art technology and security, a design that lends itself to future growth and energy efficiency components that would ultimately reduce operational costs down the road.

    Wights plan of action still has to be approved by the full County Board, which meets later this month.

    See the article here:
    Courthouse design team could handle PR for county board

    Architectural Services – Commercial Architectural Services … - June 10, 2014 by Mr HomeBuilder

    Our range of Architectural Services is executed by our dedicated team of professionals, which includes concept development and designing of buildings. The services offered by us are cost-effective, reliable and completed within the stated time frame. Further, to gain utmost client satisfaction, we execute our services as per the specific needs and demands of the clients. This category includes Commercial Architectural Services and Residential Architectural Services. These services are explained below:

    We are engaged in offering Commercial Architectural Services that are very different from Residential Architecture Services. The material used Residential Architecture also differs the material used in Commercial Architecture and depends upon the type of commercial building. Aluminum Glazing, Aluminum Composite Panels, different natural stones and Glass Glazing are used by in the execution of Our Front Elevation for commercial purposes. Our designed and developed building can be used for corporate offices or hotel or retails outlets or a combination of all these. These depend upon the type of building and the type of footfall, the selection of materials are made. Our services include includes Front Elevation, Layout Planning, Electrical Design, Plumbing Design and Structural Design.

    Features:

    Your enquiry has been sent

    We hold specialization in offering attractive and reliable Residential Architectural Services. This service includes Front Elevation, Layout Planning, Electrical Design, Plumbing Design and Structural Design. These all services are offered as a bouquet of services and try to offer our clients under one roof. However, we offer our Front Elevation Services as a standalone service for both new constructions and for old constructions. All our residential services are offered as per the clients' requirements.

    Features:

    Read more here:
    Architectural Services - Commercial Architectural Services ...

    GBS Architectural | Commercial Architectural Services … - June 6, 2014 by Mr HomeBuilder

    Building Surveys

    We are able to carry out measured building surveys and provide drawings of your existing premises, providing varying levels of detail from basic room sizes to full details showing window cill and head heights, door heights, floor to floor heights, direction of joists, details of roof construction, position of incoming services, drainage and more.

    We are able to provide schematic and detailed drawings for internal alterations, submitting and obtaining building regulation approval and liaising with Contractors on your behalf to ensure you get the quality of work you require.

    We are able to provide full plans and elevations, submitting on your behalf and obtaining planning permission from the local authority, provide full building regulation and construction drawings obtaining full plans approval from the local authority, as well as working with Contractors to make sure you get the extension you want to your premises.

    We offer full Architectural services for the design and detailing of new build commercial properties, schematic layouts, planning drawings and process, building regulation drawings and process, construction detailing, Contractor and third party liaison along with site supervision to ensure the build is to your exact requirements.

    See the original post here:
    GBS Architectural | Commercial Architectural Services ...

    DataBid.com is Currently Reporting on the McHenry County College Architectural/Space Utilization Services Due June 19 … - June 1, 2014 by Mr HomeBuilder

    Crystal Lake, IL (PRWEB) May 31, 2014

    DataBid.com is currently reporting on the McHenry County College Architectural/Space Utilization Services due June 19, 2014, 4:00 p.m.

    Click here for complete details on the Crystal Lake, IL DataBid Project.

    As of 5/31/2014 Bids Due:

    June 19, 2014, 4:00 p.m. - Attn: Robert Tenuta, CFO/Treasurer

    Bids Due to: McHenry County College

    Location: 8900 US Highway 14, Crystal Lake, IL (McHenry) United States

    Details of Service: McHenry County College (MCC) is requesting proposals for Architectural/Space Utilization Services for construction, renovation, determining spacing needs, and/or remodeling projects.

    Divisions: Division 02 - Existing Conditions Division 06 - Wood, Plastics and Composites Division 07 - Thermal and Moisture Protection Division 09 - Finishes

    President Jim Lamelza: "Commercial construction firms doing business in Chicago, IL are invited to try the live version of DataBid.com today. Our clients enjoy the quality of data as well as the helpful access to our editorial team and customer service specialists."

    View post:
    DataBid.com is Currently Reporting on the McHenry County College Architectural/Space Utilization Services Due June 19 ...

    Mirvish + Gehry sing a new tune: A change of plans for King Street West - May 28, 2014 by Mr HomeBuilder

    My, how things can change. With the recent announcement that Mirvish + Gehry Toronto, David Mirvishs proposed mixed-use development under the architectural services of Frank Gehry, has been almost completely revised, it is a striking about-face that has taken place and for the better, for Torontos sake.

    Since I last wrote on the proposal, the project has lost a tower (for a new total of two), figured out a way to save both the Princess of Wales Theatre as well as two of the existing heritage-designated warehouse faades, and has still managed to maintain its planned addition of commercial, office, gallery, and educational spaces for OCADU. The only increase? A few more floors of condos, bringing the towers to 92 and 82 storeys respectively. But really, whats six more floors when youre that tall already? All-in-all, I think its a fair deal.

    First, however, I believe it is pertinent to restate that the saving of the Princess of Wales is anything but a small victory for the collective cultural memory and life of the city. This is both an active and thriving place of performance, as well as having shared public meaning having just celebrated its twentieth anniversary last year and it is both great news, and really a relief, that it will be maintained. As well, the conservation of two of the four warehouses, while perhaps token faadism, is a step forward as the design plans continue to be resolved.

    In my previous piece on the project, I stated, Gehry is a great architect there should therefore be a way for him to make an affordable, proportional and historically/culturally sensitive development that would have thepotentialto become a new icon for Toronto, while still being a part ofexistingToronto. And I stand by this comment now more than ever, for it appears that Gehry has proven it to be true.

    But what I find most interesting is that Gehry is now apparently looking for a sense of dignity to be the hallmark of the project. What is so intriguing about this is that, before this recent turn of events, or rather plans, the branding and promotion of the project seemed to be centred around the notion of creating an iconic architecture perhaps not an antonym, but definitely not a synonym for dignity. For the expression of creating (as opposed to a great building becoming) an icon conjures up ideas of loud, flashy star-architecture, one meant to claim its importance to the city not through merit given, but rather from sheer volume, intensity, or abstraction.

    Dignity, on the other hand, seems to allude to a sense of understanding of place, context, and appropriateness. Now this is not to say a dignified building cannot be tall, grand, or one that stands out visually from the rest, however, the word alone seems to suggest a very different direction and nuance than that of iconic. But for whatever reason that has caused this change ofheart, I believe it is for the better, and in fact think that the project, if it continues to strive to build truly great architecture, may come to be known as an icon of and for Toronto after all. But this will ultimately be up to the people to decide.

    For now, it appears, that the emphasis, focus, and conversation of the project has finally returned to the architecture itself, rather than a superficial notion of building an icon. And we can now begin to talk about the towers cascading like waterfalls, solid-void relationships, proportions, and relationships to the surrounding site and urban context. We can talk about materiality, texture, and light, and we can analyze how the new structure will meet the street.

    For example, in terms of the current projects urban presence, there now appears to be a well-balanced approach to the streetscape through the maintaining of the existing street edge for a large portion of the block along King Street, between John Street and Ed Mirvish Way, while the Northwest corner of King and John will see the new structures meet the ground, creating a new presence and dialogue with the city, while not completely swamping the site. These were not conversation that could be had before, but I am thankful that we have finally arrived at this point.

    Mirvish + Gehry have seemingly listened to what the people of Toronto (saving both the theatre, and warehouses in part), and its city planners want (resulting in a project of a more reasonable density but perhaps this has been seen as the compromise needed to give the project a fighting chance for approval), while still allowing for Gehry to make use to his own artistic genius. This has shown that people can advocate for their cities, architects can work creatively within this desires, and I believe we have gotten a much more elegant design proposal as a result.

    We can now all go back to gushing over Gehry.

    Read the rest here:
    Mirvish + Gehry sing a new tune: A change of plans for King Street West

    How your new East Perth will look - May 27, 2014 by Mr HomeBuilder

    More details have been released about the transformation of an extensive plot in East Perth. Photo: Aleisha Orr

    The revitalisation of the quieter part of East Perth is progressing with the old Chem Centre building going on the market.

    Minister for Planning John Day announced that expressions of interest were being sought for developers work on the 5,335sqm site.

    With potential for retail, residential and commercial accommodation ranging from four to 16-storeys, development of the site Lot 101, Hay Street- will ensure the new East Perth community has adequate access to a variety of shops and essential services close to where they live, he said.

    Lot 101 Hay Street will breathe new life into the area.

    The development is expected to brighten up the area that will also benefit from other works happening in the area as part of the state governments Riverside project.

    Advertisement

    Further east, next year Lend Lease will start construction on Waterbank which includes as extension of Hay Street to the Swan River, a public beach, jetty and up to 1000 new apartments, Mr Day said.

    The heritage listed building is the pink brick building behind us and that has been used for, I would say, 30 to 40 years, as the Chemistry Centre laboratories for Western Australia.

    The Chemistry Centre is an important agency in analysing a whole range of scientific tests in relation to illicit drugs for example, environmental protection, the racing industry, they play an important role in and other scientific research, theyve been relocated about eight years ago I think it was, into a new building purpose built for them at Curtin University site, this site has been disused since then.

    Read the original:
    How your new East Perth will look

    Transformation of East Perth but brick walls stay - May 27, 2014 by Mr HomeBuilder

    More details have been released about the transformation of an extensive plot in East Perth. Photo: Aleisha Orr

    The revitalisation of the quieter part of East Perth is progressing with the old Chem Centre building going on the market.

    Minister for Planning John Day announced that expressions of interest were being sought for developers work on the 5,335sqm site.

    With potential for retail, residential and commercial accommodation ranging from four to 16-storeys, development of the site Lot 101, Hay Street- will ensure the new East Perth community has adequate access to a variety of shops and essential services close to where they live, he said.

    Lot 101 Hay Street will breathe new life into the area.

    The development is expected to brighten up the area that will also benefit from other works happening in the area as part of the state governments Riverside project.

    Advertisement

    Further east, next year Lend Lease will start construction on Waterbank which includes as extension of Hay Street to the Swan River, a public beach, jetty and up to 1000 new apartments, Mr Day said.

    The heritage listed building is the pink brick building behind us and that has been used for, I would say, 30 to 40 years, as the Chemistry Centre laboratories for Western Australia.

    The Chemistry Centre is an important agency in analysing a whole range of scientific tests in relation to illicit drugs for example, environmental protection, the racing industry, they play an important role in and other scientific research, theyve been relocated about eight years ago I think it was, into a new building purpose built for them at Curtin University site, this site has been disused since then.

    Continued here:
    Transformation of East Perth but brick walls stay

    BRG Adds T2pm Limited Employees to Growing Team - May 23, 2014 by Mr HomeBuilder

    Dallas, TX (PRWEB) May 23, 2014

    BRG announced today that T2pm Limited, based in Winston-Salem, North Carolina, has entered into an agreement to join forces with BRG. The addition of principals Lynda McCutchen and Patrick Welsh to BRG adds the benefit of more than 30 years of experience in construction and facilities project management, strategic planning, facilities condition assessment and capital planning, commercial interior design, and relocation services, particularly in the South Atlantic markets.

    T2pm Limited was founded in 2003 by Welsh, who had spent more than two decades working for architectural firms, corporate real estate groups, and general contractors as a project manager overseeing projects from Massachusetts to Florida. Through his experiences, Welsh recognized an increased demand for owner's representation and coordination. T2pms 11-year mission has been to provide clients with guidance for their facilities projects, specifically regarding owner's responsibilities, increased efficiencies, and integrated project delivery. Working alongside owners, architects, general contractors, and engineers to facilitate project success has been T2pm's mission.

    We pride ourselves in effecting a consistently high level of satisfaction, cooperation, and teamwork with each project we manage to help our clients redefine the way CRE and FM business is conducted, said Welsh. "By joining BRG, we are now able to offer national and global support options to our clients, provision variable resourcing options, and offer a broader range of products and services around corporate real estate, facilities management, and IWMS/CAFM technologies. We look forward to introducing all of our clients and prospects to the capabilities of BRG as we transition our business from T2pm to BRG."

    McCutchen joined T2pm in 2009 as a majority partner, increasing the firms capabilities in property management, facilities management, corporate real estate, pre-design programming, strategic planning, relocation management, commercial interior design, and executive reporting.

    Traci Doane, BRGs CEO, commented, BRG is excited to welcome Patrick and Lynda into BRG. We believe this will not only help us more aggressively grow our presence in the South Atlantic marketplace, but will also increase our delivery capabilities in construction and facilities project management. We are gaining the addition of two extremely talented consultants to complement BRG's rapidly growing team."

    About BRG

    BRG provides innovative Workplace Management Solutions. We specialize in business advisory services, technology deployment and program management/staff augmentation in support of Corporate Real Estate and Facilities Management organizations. BRG helps clients align people, processes and technology with their overarching business strategy. BRG achieves this through three complementary service lines:

    Since formation in 1986 in San Jose, California, BRG has helped clients identify business strategies and implement solutions. BRG is headquartered in Dallas, Texas with employees in over 30 cities across North America, Europe and Asia.

    ####

    Read more from the original source:
    BRG Adds T2pm Limited Employees to Growing Team

    Architectural Billings Decline Again in April - May 22, 2014 by Mr HomeBuilder

    The American Institute of architects (AIA) has reported a drop in design services over the last two months. The Architectural Billings Index (ABI) score for April was 49.6, slightly higher than Marchs reading of 48.8. Any score above 50 indicates an increase in billings.

    Last month, the AIA added a new indicator measuring the trends in design contracts at architecture firms. The mark signals the direction of future architecture billings. The score for design contracts in April was 54.6. In another sign of confidence, the new projects inquiry index was 59.1, up from 57.9 the previous month.

    Despite an easing in demand for architecture services over the last couple of months, there is a pervading sense of optimism that business conditions are poised to improve as the year moves on, AIA chief economist Kermit Baker said in a statement. With a healthy figure for design contracts, this should translate into improved billings in the near future.

    The South reported the highest score of all regions with 57.5, followed by the West (48.9), Midwest (47.0), and Northeast (42.9). With a rating of 52.6, multi-family residential led the way across sectors at 52.6. Commercial/industrial came in at 50.2, while mixed practice was slightly higher with a reading of 50.7. The institutional index score was 47.1.

    See the original post here:
    Architectural Billings Decline Again in April

    « old entrysnew entrys »



    Page 33«..1020..32333435..4050..»


    Recent Posts