Categorys
Pages
Linkpartner


    Page 57«..1020..56575859..70..»



    West Star Aviation Receives Approval For Installation Of PMA Replacement Waste Drain Valve For Hawker Aircraft - February 12, 2014 by Mr HomeBuilder

    East Alton, Il, February 7, 2014West Star Aviation recently announced they are now offering a Waste Drain Valve Modification for Hawker 800, 800XP, and 850XP. The valve is manufactured and certified under FAA Parts Manufacturer Approval PMA and replaces the factory installed valve, which allows leakage and the potential for corrosion.

    The factory installed valve on the Hawker 800/800XP/850XP aircraft requires a T-Handle tool to remove the secondary pressurization plug or donut. If this plug is re-installed incorrectly, or in some cases not installed at all, the opportunity for leakage is greatly increased. This presents the possibility of the user being soaked during servicing as well as a potential risk for corrosion damage.

    In addition, if the plug is missing, the MMEL for the Hawker states the aircraft is restricted to unpressurized flight and a ceiling of 15,000 ft. until it is replaced. This can cause dispatch problems of hours or days if the aircraft is in a part of the world where parts support is difficult.

    Most Hawker operators are familiar with the unpleasant task of draining their lavatory waste tank, said Kendall Kreiling, Hawker Program Manager, West Star Aviation. We can install a significantly improved version of the valve, which will eliminate the corrosion and downtime risk, as well as make the whole process much simpler for operators.

    The new valve features a spring-loaded internal fluid valve that opens with the small external level after the ground service cart duct is connected. This eliminates the mess if the tank valve leaks. Closing the internal valve is as simple as closing the cap with the over-center lever.

    This modification can easily be incorporated with maintenance, avionics installation, paint or interior services at West Star. To learn more about the modification or see photos please visit http://www.weststaraviation.com/airframes/hawker, or contact Kendall Kreiling at 800-255-4193, or kkreiling@wsa.aero.

    West Star Aviation, Inc. specializes in the repair and maintenance of airframes, windows, and engines, as well as major modifications, avionics installation and repair, interior refurbishment, surplus avionics sales, accessory services, paint and parts.

    In addition to its facilities in East Alton, IL; Grand Junction, CO; and Columbia, SC. West Star Aviation runs the maintenance operations at Aspen-Pitkin County Airport in Aspen, CO and at Spirit of St. Louis Airport in Chesterfield, MO. The company also provides complete FBO services for transient aircraft at its newly remodeled East Alton and Grand Junction facilities. West Star Aviation, Inc. is an industry leader in technical experience and expertise while providing world-class customer services in all the organizations divisions. For more information visit http://www.weststaraviation.com or call 800-922-2421.

    Go here to read the rest:
    West Star Aviation Receives Approval For Installation Of PMA Replacement Waste Drain Valve For Hawker Aircraft

    Soon-to-be dad's starry DIY nursery project goes viral - February 6, 2014 by Mr HomeBuilder

    Dads

    Jessica Dukes TODAY contributor

    5 hours ago

    Brian d'Arcy

    Soon-to-be dad Brian d'Arcy uploaded a gif of the starry, fiber optic ceiling in his unborn son's nursery to Reddit.

    On January 30, Brian dArcy of Philadelphia posted an animated GIF of his latest project to Reddit(see above), saying, My wife and I are expecting our first son in June so I decided to install a fiber-optic star ceiling in the nursery I am building! Fellow Redditors' prodding for how-to shots led Brian to create the subsequent Imgur album,My Sons Star Ceiling, which has garnered some 300,000 views in a week.

    After finding out that a baby was on the way, Brian remembered seeing the concept of a starry ceiling somewhere, but couldn't recall where. In researching the possibilities, he quickly found pictures and how-to videos online.

    While a project like this may seem daunting to most of us, 27-year-old Brian also happens to be an engineering student. Armed with a $400 kit from Wiedamark, he told TODAY that the 40-hour installation was more tiresome than difficult. Being by myself, the install was very tedious, said Brian.

    I would have to drill 10-20 holes in the room, climb up in to the attic, pull the same amount of fiber strands from the bundle, crawl over to the holes without putting my foot through the ceiling, and fish each strand through the holes, Brian explained. Every single strand had to be glued in place after they were installed to secure them. There are 600 strands, so even if I did 20 every time, that's 30 trips to the attic.

    Well, the epic DIY project has paid off, as mom-to-be thinks the space is amazing, according to Brian. I'm not always the best at verbally expressing how excited I am that we are expecting, so this was kind of my way to show her, he added.

    View post:
    Soon-to-be dad's starry DIY nursery project goes viral

    Cool-phase Science Improves the Student Environment in Bournemouth University Laboratory - February 6, 2014 by Mr HomeBuilder

    High Wycombe, UK (PRWEB UK) 6 February 2014

    The second-floor laboratory in Christchurch House regularly accommodates up to seventy students at the same time, carrying out practical scientific experiments. With Bunsen burners and fume cupboards being used throughout the day, and seventy people, each student generating 100 Watts of heat gain combined with substantial levels of carbon dioxide (CO2), there were on-going problems with the 100 square metre space due to poor indoor air quality. Whilst the laboratory was fitted with windows, its second-floor location meant that restrictors were fitted; so the limited amount of fresh air entering the space was not enough to reach all areas of the deep-plan space.

    The Universitys Estates Department decided it was time to address the problem and the Henderson Green mechanical/electrical engineering consultancy based in Southampton, which supplies design services to Bournemouth University on a range of projects, was briefed to improve environmental conditions within the space.

    Henderson Green managing director Russell Pitman says first thoughts involved traditional approaches such as AC units or a roof-mounted air handling unit pumping fresh air into the laboratory.

    But having discussed options with the Universitys Environment & Energy Team it was decided to investigate alternatives that would also provide a low carbon solution.

    Commenting for the University, the Estates Departments Energy Officer (Technical) Dave Archer says that during the initial search he came across a Cool-phase article in a HVAC journal and decided to add the new system to the list.

    The Cool-phase system, which reduces the running costs of buildings and creates a fresh and healthy indoor environment without compressors or hazardous coolants, can maintain temperatures within the comfort zone, while radically reducing energy consumption by up to 90% compared to conventional cooling systems.

    Henderson Green was then asked to undertake a feasibility study to establish whether Cool-phase could handle the two key objectives the fresh air requirements and the cooling load; and Monodraught was asked to design the system and provide calculations to confirm it could achieve the required flow rates, etc.

    Says Russell: We reviewed, and eventually tested, Monodraughts Cool-phase system against the air handling option and found that from the energy-saving viewpoint Cool-phase won hands-down, with relatively little increase in cost. Encouraged, we then went into a more detailed phase with Monodraught to ensure that the initial calculations matched the requirements of the space in everyday operational conditions.

    Once the air quality calculations and financial appraisals were completed and the University was satisfied that the system would do the job, Cool-phase was given the green light and two systems were installed in the laboratory by Monodraught, as part of a turnkey contract with one of the Universitys approved building contractors.

    See more here:
    Cool-phase Science Improves the Student Environment in Bournemouth University Laboratory

    All-Bright Systems -Suspended Ceiling Installation Service Windham NH – Video - February 5, 2014 by Mr HomeBuilder


    All-Bright Systems -Suspended Ceiling Installation Service Windham NH
    http://www.localedge.com/listing/160048/101739/All-Bright+Systems+Suspended+Ceiling+Installation+Service/8777937989/46+Lowell+Rd/Windham/NH/03087?type= ceili...

    By: LocalEdge VideosOne

    Original post:
    All-Bright Systems -Suspended Ceiling Installation Service Windham NH - Video

    Precision Office Furniture Installation Completes Major Out-of-State Project - February 4, 2014 by Mr HomeBuilder

    (PRWEB) February 04, 2014

    Precision Office Furniture Installation, a regionally acclaimed office furniture installer, has just finished a large office furniture installation project for health insurance provider Humanas corporate office in Louisville, Kentucky.

    Here at Precision Office Furniture Installation, we are proud to be able to handle installation projects of all sizes, says a spokesperson for Precision. The success of the Humana office project demonstrates that there truly is no job too large for our company.

    This out-of-state project was notable for its size. Precision was able to:

    -Install Teknion Optos and Altos floor-to-ceiling products office-wide -Outfit 28 executive offices with Optos walls and lockable barn doors -Install two conference and eight huddle rooms with Altos walls with double pane glass and clear swing doors.

    Whether youre a small business or Fortune 500 Company, our team can handle any sized commercial move, says a company spokesperson. We have experience working with companies of all scopes and sizes.

    Precision Office Furniture Installations services include:

    -New Office Furniture Installation -Pre-owned Office Furniture Installation -Asset Inventory Management -Corporate Relocation -Project Management -Facility Decommissioning -And many more

    For more information, visit http://precisionco.com/

    About Precision Office Furniture Installation:

    Read the original:
    Precision Office Furniture Installation Completes Major Out-of-State Project

    Drywall Saw features 1.8 mm thick blade to prevent bending. - February 4, 2014 by Mr HomeBuilder

    CAMARILLO, Calif. Platinum Tools (www.platinumtools.com), the leader in solutions for the preparation, installation and hand termination of wire and cable, is proud to announce the launch of the updated PRO Drywall Saw (p/n 10711). With an MSRP of $12.95 and now shipping, the PRO Drywall Saw with sheath is ideal for cutting drywall, plywood, plasterboard, wallboard, plastic paneling, and ceiling tile.

    Designed with the professional installer in mind, the PRO Drywall Saws teeth are precision ground for fast and effortless cutting in both directions, both push and pull, explained John Phillips, Platinum Tools, Inc. product manager. The blade is an extra thick 1.8mm to prevent bending and breaking during use, whether cutting, punching, or scoring.

    The PRO Drywall Saw has a heavy duty handle designed with a non-slip grip for comfort and safety, a hardened blade tip designed to score or punch with ease, a clog free hardened steel blade, and a one piece handle and blade design.

    Extremely rugged and durable, the PRO Drywall Saw also has a rust resistant electrophoretic deposition on the blade, Phillips continued. Ideal for numerous applications, this saw is a must have for the discerning installer and technician.

    For more information on the PRO Drywall Saw and Platinum Tools complete product line, please visit http://www.platinumtools.com, call (800) 749-5783, or email info@platinumtools.com.

    About Platinum Tools Platinum Tools, founded in 1997, was created based upon two very simple objectives. First, develop the absolute best possible solutions for the preparation, installation, and hand termination of wire and cable. Second, implement an operational infrastructure that can deliver these products in an efficient, timely, and high quality manner.

    All of our products must absolutely satisfy three critical benchmark criteriautility of function; quality of function; and economic value. Our people are our company. They, too, must be focused on and work to satisfy three critical benchmark criteriacustomer satisfaction; product knowledge and expertise; and willingness to learn and adapt.

    Original post:
    Drywall Saw features 1.8 mm thick blade to prevent bending.

    Vault Ceiling Installation by Deaton Builder’s, Inc. – Video - February 2, 2014 by Mr HomeBuilder


    Vault Ceiling Installation by Deaton Builder #39;s, Inc.
    Customer had a long boring living room. They wanted a more open feeling. We removed all the old ceiling and framing and installed new framing along with upda...

    By: David Deaton

    Read more:
    Vault Ceiling Installation by Deaton Builder's, Inc. - Video

    Terex Material Handling Wins Order to Provide Demag KBK Modular Crane System to Heraeus Tenevo - January 30, 2014 by Mr HomeBuilder

    Cleveland, Ohio Terex Material Handling announced an order for Demag KBK Modular Crane System from Heraeus Tenevo.

    "Earlier this year we had the need to upgrade six hoist systems in our facility to a higher capacity," says Kenneth Koch, Senior Process Specialist of Production Engineering, Heraeus Tenevo. "A couple of the systems were going to be very tricky due to installation time constraints, a relatively low ceiling height, and the need to work around potentially dangerous chemicals. After considering various products and installers, we decided on using Demag products and having SJA Materials Handling do the installation."

    Of the project's results, Koch said, "The installation went as planned and we were happy with the results. Bottom line, many hours of pre-planning on SJA Materials Handling part, good factory Demag support, and flexible quality products allowed us to accomplish our goals of having safer and easier to use hoist systems."

    About Heraeus Heraeus, the precious metals and technology group headquartered in Hanau, Germany, is a global, private company with more than 160 years of tradition. Their fields of competence include precious metals, materials and technologies, sensors, biomaterials and medical products, quartz glass, and specialty light sources. In the financial year 2012 Heraeus generated product revenues of Euros4.2 billion and precious metal trading revenues of Euros16 billion. With more than 12,200 employees in over 100 subsidiaries worldwide, Heraeus holds a leading position in its global markets.

    About Terex Material Handling Terex Corporation is one of the world's leading suppliers of crane technology with Demag industrial cranes and crane components. The core competence of the Terex Material Handling business group lies in the development, design and production of technically sophisticated cranes, hoists and components and the provision of sales and services for these products. The business group manufactures in 16 countries on five continents and is present in more than 60 countries, reaching customers in more than 100 countries.

    Terex Corporation is a diversified global manufacturer of a broad range of equipment. A core activity of Terex Corporation is the provision of reliable, customer-driven solutions for many applications, including the construction, infrastructure, shipping, transport, quarrying, mining, refining, energy, utility and manufacturing industries. Terex reports in five business segments: Aerial Work Platforms; Construction; Cranes; Material Handling Port Solutions; and Materials Processing Terex Financial Services offers a wide range of products and services to assist in the acquisition of Terex equipment. Please visit our websites at http://www.demag-us.com and http://www.terex.com for further information.

    Contact for product and trade media Dan Konstantinovsky Phone: (440) 248- 2400 Email: dan.konstantinovsky@terex.com

    Follow this link:
    Terex Material Handling Wins Order to Provide Demag KBK Modular Crane System to Heraeus Tenevo

    Watch an Epic Light Installation That Dangles From the Ceiling - January 28, 2014 by Mr HomeBuilder

    GRID is an audio/visual installation by Tetro and Christopher Bauder. Image: Andrea Aubert

    GRID is an audio/visual installation by Tetro and Christopher Bauder. Image: Andrea Aubert

    150 LED rods are suspended from the ceiling. Image: Andrea Aubert

    150 LED rods are suspended from the ceiling. Image: Andrea Aubert

    They form 50 motorized LED triangles. Image: Andrea Aubert

    They form 50 motorized LED triangles. Image: Andrea Aubert

    Live music from Robert Henke is synchronized to Bauders lighting and triggers the movements of the GRID. Image: Andrea Aubert

    Live music from Robert Henke is synchronized to Bauders lighting and triggers the movements of the GRID. Image: Andrea Aubert

    Every sound and each bit of music composed by Robert correlates with a visual impulse and spatial alteration of the mechatronic display, Bauder explains. Image: Andrea Aubert

    Every sound and each bit of music composed by Robert correlates with a visual impulse and spatial alteration of the mechatronic display, Bauder explains. Image: Andrea Aubert

    Read the original:
    Watch an Epic Light Installation That Dangles From the Ceiling

    Tin Ceiling Installation (Complete SnapLock Video) – Video - January 25, 2014 by Mr HomeBuilder


    Tin Ceiling Installation (Complete SnapLock Video)
    Tin Ceiling panel installation with a patented flange system from the American Tin Ceiling Company. This patented product is designed to be screwed in to dry...

    By: Am Tin

    Here is the original post:
    Tin Ceiling Installation (Complete SnapLock Video) - Video

    « old entrysnew entrys »



    Page 57«..1020..56575859..70..»


    Recent Posts