Categorys
Pages
Linkpartner


    Page 146«..1020..145146147148..»



    Apartment Construction in Pasig Part 2/3 - October 5, 2011 by Mr HomeBuilder

    Here's more video of the apartment building being constructed. From the second floor of the third door I got down to the groundfloor to take a video of the whole building from the cramped sidewalk and from the street's view of the front part of the building

    See original here:
    Apartment Construction in Pasig Part 2/3

    A Kapla Apartment Building in Blender - October 5, 2011 by Mr HomeBuilder

    I've been working on quite a few physics-based renderings lately, both in maya and blender, and this one is probably my best, and my last, as I need to move on to other projects. Oh and this video was uploaded before YouTube offered CC licences, hence the licence statement at the end. This construction is made entirely out of simulated Kapla blocks, which in reality have dimensions in the ratio of 1:3:15, with the longest side measuring 12cm

    Visit link:
    A Kapla Apartment Building in Blender

    2010 Shanghai World Expo, construction timelapse of Broad Pavilion - October 5, 2011 by Mr HomeBuilder

    Video shot in April of 2010, documenting the construction of Broad Pavilion at 2010 Shanghai World Expo Here is more info on the Pavilion from China Daily Expo pavilion built in 24 hours By WEI TIAN (China Daily) Broad pavilion, one of 17 corporate pavilions at the Shanghai Expo, was completed within 24 hours. provided to china daily Group builds 6-story energy efficient Expo pavilion in less than a day, presenting a model for the future of residential communities, offices and hotels Rome wasn't built in a day, but a Shanghai Expo pavilion can be as contractors proved this month by having the Broad pavilion up and running in just 24 hours. The Broad pavilion was the 17th and final corporate pavilion at the Expo site.

    Original post:
    2010 Shanghai World Expo, construction timelapse of Broad Pavilion

    Construction Timelapse at Michigan Technological University - October 5, 2011 by Mr HomeBuilder

    Watch 10 months of construction in 3 minutes with this time lapse of the newly opened Residential Apartment Building at Michigan Technological University.

    Read the original here:
    Construction Timelapse at Michigan Technological University

    Hotel Apartment Concept Presentation - October 4, 2011 by Mr HomeBuilder

    A Concept Presentation for the local authorities approval. Next to Vodacom building, its a design skyscraper that makes the Maputo Downtown new image and accelerated development lived in the early 5 years.

    The rest is here:
    Hotel Apartment Concept Presentation

    Concern South Hill Apartment Complex Construction Will Destroy Wetlands - October 4, 2011 by Mr HomeBuilder

    A new apartment building, under construction on Spokane's South Hill, is going up near the Palouse Highway. However, the people who live in the apartments nearby want the construction to stop

    See the original post here:
    Concern South Hill Apartment Complex Construction Will Destroy Wetlands

    Toronto Apartment – Leacrest Rd and Mallory Cres Toronto – Lawrence Construction - October 4, 2011 by Mr HomeBuilder

    http://www.crestview.ca Just around the corner from Bayview and Eglinton, you will find high quality accommodations in a quiet, secluded neighbourhood. The complex totals 22 2-storey buildings separated by expansive lawns creating a park-like setting.

    See the article here:
    Toronto Apartment - Leacrest Rd and Mallory Cres Toronto - Lawrence Construction

    Improving air quality and energy performance of Toronto high-rise apartment buildings - October 4, 2011 by Mr HomeBuilder

    A civil engineering professor and PhD candidate from the University of Toronto explained the concept of Nested Thermal Envelope Design (NTED) at the recent Building Envelope Solutions conference. NTED was developed by Kim Pressnail, a University of Toronto civil engineering professor, Ryerson University professor Russell Richman and Marianne Touchie, a PhD candidate in civil engineering at U of T

    Follow this link:
    Improving air quality and energy performance of Toronto high-rise apartment buildings

    Murray Grove (Stadthaus) Construction Sequence 2008 - October 2, 2011 by Mr HomeBuilder

    This sequence of still images charts the construction of a pioneering building in Shoreditch, North London designed by Waugh Thistleton Architects. The entire erection of the nine storey structure was completed in nine weeks. The structure is fabricated entirely from cross-laminated timber panels, manufactured in Austria and assembled on site by KLH.

    View post:
    Murray Grove (Stadthaus) Construction Sequence 2008

    Elements Too – Highrise Construction Timelapse - October 2, 2011 by Mr HomeBuilder

    This time-lapse video was captured from my studio apartment while living at 989 Elements in Bellevue, WA. Some interesting factoids: • Video was captured from 05/23/08 to 03/06/09 only on weekdays. • There are a total of 199 days worth of video clips used in this timelapse.

    See more here:
    Elements Too - Highrise Construction Timelapse

    « old entrysnew entrys »



    Page 146«..1020..145146147148..»


    Recent Posts