CAPE GIRARDEAU, MO (KFVS) - ?Here is a list of some road projects from around the Heartland.

Butler County, MO

Route WW will be reduced to one lane while contractor crews perform asphalt resurfacing. This section of road is located between Route 53 and the railroad crossing. Weather permitting, crews will be working on Monday, April 13 at 6:30 p.m. and will reopen on Tuesday, July 21 at 6:30 a.m.

MoDOT is currently planning to improve three Butler Co. bridges. Two of the bridges are located on Route 142 over Hart Ditch and Long Slough Ditch. The third bridge is on Route 158 over the drainage ditch located about 0.7 miles west of Route BB. The project will involve replacing the existing bridges over Hart Ditch and the drainage ditch.

The bridge over Long Slough Ditch will be replaced with a culvert; grading and paving will also be completed. Acquisition of the right-of-way will be minimal and will only be required for the Hart Ditch bridge project. Existing utility lines will be affected on this project. Construction of the new bridge is expected to begin in summer 2015.

Work is expected to be finished in about four months, weather permitting. As construction is underway, Rte. 142 and Rte. 158 will be closed to through traffic in the vicinity of the bridges for the duration of the work. Property owners within the project limits will have access into their properties during this time.

Ripley/Butler Counties, MO

Route 160 in Ripley and Butler Counties will be reduced to one lane with a 12-foot width restriction as contractor crews replace culverts. This section of road is located between Route JJ and Route 67. Weather permitting, crews will be working on Tuesday, Feb. 10 through Friday, April 17 from 6 a.m. to 6 p.m. daily.

Cape Girardeau County, MO

Route BB in Cape Girardeau County will be closed as Missouri Department of Transportation crews replace a pipe under the roadway. This section of roadway is located between Route B and County Road 478. Weather permitting, work will take place Tuesday, April 7 from 8 a.m. to 3 p.m.

Read more:
Heartland road projects for 4/10

Related Posts
April 12, 2015 at 8:02 am by Mr HomeBuilder
Category: Cabinet Replacement