This sequence of still images charts the construction of a pioneering building in Shoreditch, North London designed by Waugh Thistleton Architects. The entire erection of the nine storey structure was completed in nine weeks. The structure is fabricated entirely from cross-laminated timber panels, manufactured in Austria and assembled on site by KLH.

View post:
Murray Grove (Stadthaus) Construction Sequence 2008

Related Posts
October 2, 2011 at 4:28 pm by Mr HomeBuilder
Category: Apartment Building Construction