The Kennedy-Warren is a historic eleven-story apartment house in Washington, D.C. It is located at 3131-3133 Connecticut Avenue, N.W. between the Cleveland Park and Woodley Park neighborhoods. The Art Deco building, which was constructed from 1931, overlooks the National Zoological Park and Klingle Valley Park, which is near the Art Deco Kingle Valley Bridge. The original main building was built between 1930 and 1931 with 210 apartments.
The plans of its architect called for a northeast wing and a south wing as well, but construction was delayed because of the onset of the Great Depression. The northeast wing was added in 1935 with 107 additional apartments as economic conditions improved in Washington. The B. F. Saul Company, owner of the building since 1935, added the south wing between 2002 and 2004. The architect of the northeast wing was A. H. Sonneman and of the south wing was Hartman-Cox. The current total number of apartments, ranging from efficiencies to three-bedroom units, is 425.
The Kennedy-Warren is considered the largest and best example of an Art Deco building in Washington, D.C. In 1989, the building was listed as a District of Columbia Historic Landmark, and in 1994 it was added to the National Register of Historic Places. The south wing has won numerous awards for the quality of its architecture and attention to historical detail, including the 2005 award of excellence for historic resources by the American Institute of Architects.[1][2]
In 1929, Monroe Warren, Sr. approached Edgar S. Kennedy about the possibility of constructing a large apartment house on a tract that Kennedy owned on Connecticut Avenue. Kennedy was a partner with two brothers, William and Gordon, in Kennedy Brothers Company, a real estate development firm that had built a number of apartment houses in Washington,D.C., including 2400 16th Street, N.W., facing Meridian Hill Park. Warren owned a construction firm, Monroe and R. B. Warren, Inc., that built co-operative apartment houses, including Tilden Gardens.
Kennedy and Warren hired the architect Joseph Younger (18921932) to design the building. Younger was a native of Washington, D.C., and was graduated in 1912 from the architecture school at George Washington University. Kennedy and Warren obtained $1.75 million in financing from the B. F. Saul Company, American Security Bank, and the Union Trust Company. They started work on the central section and the northwest wing (both facing Connecticut Avenue) in October 1930, and the building opened in October of the following year. Kennedy and Warren had been promised a loan by the Integrity Trust Company in Philadelphia to build the northeast and south wings, but it fell through with the worsening economic depression. In 1932, they filed for bankruptcy. The B. F. Saul Company, as the principal creditor, obtained title to the building in 1935.[3]
Since the site of the Kennedy-Warren slopes steeply from Connecticut Avenue down to the National Zoo, the lobby level is designated as the third floor. The two residential levels below that have apartments that face the zoo. Below those are four basement levels, including a large parking garage. The building is an imposing sight on Connecticut Avenue because of its massive size and fine detailing, which includes tan and orange variegated brick, limestone carvings, and the extensive use of aluminum. The Kennedy-Warren was the first building in Washington, D.C., to use aluminum extensively; applications include the entrance porch, spandrels between the windows on the faade, balustrades in the lobby, and even an aluminum-leaf arched ceiling in the ground-floor corridors, unique in Washington, D.C. The stone carvings are in the Aztec Deco style, influenced by the carved stonework of ancient Mexico, and include griffins, eagles, and a frieze of elephants and starbursts and they rise three floors above street level.
An unusual feature of the Kennedy-Warren when it opened in 1931 was its air-cooling system. Three enormous fans drew cool air from Klingle Park at the back of the building and forced it through the public corridors. Residents could then open metal louvers above their hallway doors to cool individual apartments. Cross-ventilation during temperate weather was so effective that doorstops were required to prevent doors from slamming closed if left ajar. Advertisements for the Kennedy-Warren showed that the air was at least ten degrees cooler than on Connecticut Avenue. The fans were removed during the 200911 renovation after central air conditioning was installed.[4]
In 2002, the B. F. Saul Company undertook construction of the uncompleted south wing. Obtaining the necessary permits and approvals had taken five years. The architect was Hartman-Cox of Washington, D.C. The plans followed Joseph Youngers 1931 design very closely for the exterior. The Belden Brick Company of Ohio made the variegated brick to match exactly the brick of the historic building. New carvings of Indiana limestone match those in the original building as well. The Boose Aluminum Foundry Company of Reamstown, Pennsylvania, cast the spandrels for the south wing. (ALCOA had cast the originals on the historic main building.) Hartman-Cox diverged from Youngers plans for the exterior in one respect, by adding balconies to the south and east sides where the south wing faces the National Zoo.
Joseph Youngers plan for the interior called for long corridors running through each floor. Hartman-Cox consulted with Robert M. Swedroe Architects and Planners of Miami, Florida, who are experts in apartment floor plans. They proposed replacing the long corridors with two widely spaced elevators, which in some cases open directly into the apartments. Eliminating the corridors saved space, increased privacy, and allowed for much larger apartments, some of which are unusual pass-through apartments. They have windows on both the front and the back of the building. Only the corridor on the ground floor connects to the 1931 building. The layout of the apartments is traditional, with enclosed kitchens and formal dining rooms. The largest, with two bedrooms, two baths, and a den, is 2300 square feet. The south wing was completed in 2004. The amenities include a fitness club with steam rooms and a swimming pool facing the zoo. There is a large parking garage as well.[5]
In 2009, the B. F. Saul Company, undertook the restoration and renovation of the historic main building, a project that was expected to cost $60 million. Contractors installed new double-hung mahogany windows, built a new roof and roof deck, and carefully cleaned the brick faade and aluminum spandrels following preservation standards. After discussions with the Art Deco Society of Washington, D.C. as well as the residents, the B. F. Saul Company decided to preserve the original floor plans of most apartments. As the contractors renovated each apartment, they kept the original hardware, including the glass doorknobs and brass hinges, as well as the kitchen cabinets and apartment doors, and they sanded and stained the original wood floors. To bring the building up to current standards, they replaced the wiring and plumbing, and installed a sprinkler system and central air-conditioning in the apartments and public areas. The central air-conditioning replaced the huge basement fans, which had been in use since 1931, as well as window units. The company put new stoves and refrigerators in the apartments and, for the first time, washers and dryers. Shops and businesses on the lobby floor supplied such services for the residents.
Original post:
Kennedy-Warren Apartment Building - Wikipedia, the free ...
- Tobin proposes 120-unit apartment building in Hollywood, amid record multifamily construction pipeline - The Real Deal - November 21st, 2024 [November 21st, 2024]
- Modular Housing Construction in Chatsworth Builds Apartments for Homeless - San Fernando Valley Sun - November 21st, 2024 [November 21st, 2024]
- What's that going to be inside Meridian Plaza? - The Edwardsville Intelligencer - November 21st, 2024 [November 21st, 2024]
- A noodle bar and a cafe are coming to North Front Street below a new apartment tower - The Philadelphia Inquirer - November 21st, 2024 [November 21st, 2024]
- New, 270-unit Staten Island apartment building opens with 138 apartments for formerly homeless - SILive.com - November 21st, 2024 [November 21st, 2024]
- Sewer, water installations for new apartment building closing a Jackson street - MLive.com - November 21st, 2024 [November 21st, 2024]
- New apartments coming for busy North End, downtown Boise intersection. Rent may be cheap - Idaho Statesman - November 21st, 2024 [November 21st, 2024]
- A rental reckoning is coming to Twin Cities housing - Star Tribune - November 21st, 2024 [November 21st, 2024]
- New York Doesnt Have Enough Housing. Why Is It So Expensive to Build? - The New York Times - November 21st, 2024 [November 21st, 2024]
- Residents ordered to evacuate high-end Cambridge condos over safety concerns - NBC Boston - November 21st, 2024 [November 21st, 2024]
- Metro Vancouver eyes standardized six-storey wood apartments - Vancouver Sun - November 21st, 2024 [November 21st, 2024]
- Multifamily permitting drops in urban areas - Multifamily Dive - September 7th, 2024 [September 7th, 2024]
- Apartment Construction Is Slowing, and Investors Are Betting on Higher Rents - WSJ - The Wall Street Journal - September 7th, 2024 [September 7th, 2024]
- Multifamily home construction still slowing, but predicted rate cuts could lower barriers - Star Tribune - September 7th, 2024 [September 7th, 2024]
- The Construction Site Outside My Building Is Filthy. What Can I Do? - The New York Times - September 7th, 2024 [September 7th, 2024]
- Single-family construction is on the rise in the Twin Cities, while apartment construction is in a free-fall. - Star Tribune - July 6th, 2024 [July 6th, 2024]
- Deacon Development Group Announces Grand Opening of 126-Unit Merx Apartment Building in Portlands Slabtown - The Registry Seattle - July 6th, 2024 [July 6th, 2024]
- Housing construction in greater Boston stymied by sky-high costs - The Boston Globe - July 6th, 2024 [July 6th, 2024]
- Multifamily construction spending trending lower in May - Yield PRO magazine - July 6th, 2024 [July 6th, 2024]
- SuperBungalows, a New Cross-Laminated Timber Apartment Building, is a Los Angeles First - Architectural Record - May 27th, 2024 [May 27th, 2024]
- Gallery: See what's under construction near Cornell this spring - The Ithaca Voice - May 27th, 2024 [May 27th, 2024]
- In West Tampa, Rome Yards construction begins with affordable and workforce apartments - 83degreesmedia - May 27th, 2024 [May 27th, 2024]
- Ennead's Mass-Timber Apartment Building in Austin Pioneers 'Productized' Housing - Architectural Record - May 27th, 2024 [May 27th, 2024]
- Inside Elyria-Swansea's 16-story apartment building that has a plant-filled canyon running through it - Denverite - February 26th, 2024 [February 26th, 2024]
- Here's the status of major apartment projects in Lancaster County - LNP | LancasterOnline - February 26th, 2024 [February 26th, 2024]
- Construction marches on for new low-income senior apartments in Colorado Springs - Colorado Springs Gazette - February 26th, 2024 [February 26th, 2024]
- Fatalities as fire engulfs apartment blocks in Spain - Construction Briefing - February 26th, 2024 [February 26th, 2024]
- Nine states pledge to transition to heat pumps for residential HVAC and water heating - Building Design + Construction - February 16th, 2024 [February 16th, 2024]
- Construction on a new apartment complex to begin in Fox Lake - WiscNews - January 5th, 2024 [January 5th, 2024]
- Park Slope's Grand Prospect Hall-Replacing Build Hits Snags - Brownstoner - January 5th, 2024 [January 5th, 2024]
- Crews Quickly Put Out Brush Fire Near Apartment Building Under Construction - Times of San Diego - January 5th, 2024 [January 5th, 2024]
- Construction to begin on Lawrence apartments in Buffalo - Buffalo News - January 5th, 2024 [January 5th, 2024]
- Construction of 190-apartment residential neighborhood in Sugovushan continues [PHOTOS] - AzerNews.Az - January 5th, 2024 [January 5th, 2024]
- Developer hopes to have prefab apartments in seven CT towns - Hartford Courant - January 5th, 2024 [January 5th, 2024]
- Apartment building destroyed after fire in Southeast Fresno - KMPH Fox 26 - April 5th, 2023 [April 5th, 2023]
- Commercial and Multifamily Construction Starts Post Solid Recovery in 2021 - Construction.com - January 25th, 2022 [January 25th, 2022]
- More high-end apartments on the way at Tobin estate as second phase of construction starts - San Antonio Express-News - January 25th, 2022 [January 25th, 2022]
- 49-unit WDM affordable apartment project expected to be completed by fall - Business Record - January 25th, 2022 [January 25th, 2022]
- Construction of Willow Valley Communities' 20-story downtown building to begin after sales of its apartments - LNP | LancasterOnline - January 25th, 2022 [January 25th, 2022]
- New Zealands bipartisan housing reforms offer a model to other countries - Brookings Institution - January 25th, 2022 [January 25th, 2022]
- HDC Hyundai Development raided in connection with Gwangju apartment building collapse - The Korea Herald - January 25th, 2022 [January 25th, 2022]
- Bend's big shift from single-family homes to more multifamily housing tops city's expectations - KTVZ - January 25th, 2022 [January 25th, 2022]
- New Construction Is Not Always the Answer - ArchDaily - January 25th, 2022 [January 25th, 2022]
- Boston-based boutique hotelier buys Wilton Manors apartment building for $8M - The Real Deal - January 25th, 2022 [January 25th, 2022]
- Miami Mayor Francis Suarez Says City Is Growing Faster Than Ever At Panel Discussion With Developers - CBS Miami - January 25th, 2022 [January 25th, 2022]
- These Will Be the Hottest Up-and-Coming NoVA Neighborhoods in 2022 - northernvirginiamag.com - January 25th, 2022 [January 25th, 2022]
- Downtown DeLand CRA throws big incentive to apartment developer - The West Volusia Beacon - January 25th, 2022 [January 25th, 2022]
- Why a 4-storey apartment could be coming to a residential street near you - CBC.ca - January 25th, 2022 [January 25th, 2022]
- He Was in Witness Protection in Maine. But His Harlem Life Kept Calling. - The New York Times - January 25th, 2022 [January 25th, 2022]
- NYCs Wealthy Enclaves Lost Housing in Past Decade as Combining of Apartments Outpaced New Construction - THE CITY - February 9th, 2021 [February 9th, 2021]
- Holladay planning $27M apartment project in Fletcher Place by former Milano Inn - Indianapolis Business Journal - February 9th, 2021 [February 9th, 2021]
- Building construction price indexes, Q4 2020 - Lumber still an issue - Electrical Business - Electrical Business - February 9th, 2021 [February 9th, 2021]
- WHATS THIS? ANOTHER 50+ AFFORDABLE APARTMENTS UNDER CONSTRUCTION - Florida Keys Weekly - February 9th, 2021 [February 9th, 2021]
- 538 new houses, condos and apartments proposed on Ann Arbors north side - MLive.com - February 9th, 2021 [February 9th, 2021]
- 7-story building with parking garage, restaurant and apartments to be built near new courthouse in Harrisburg - PennLive - February 9th, 2021 [February 9th, 2021]
- Developer of in-progress $31M housing project in Williamsville seeks tax breaks - Buffalo News - February 9th, 2021 [February 9th, 2021]
- Downtown Vancouver is on the rise - The Columbian - February 9th, 2021 [February 9th, 2021]
- Demolition in Ohio City signals big visible first step toward creation of park at Irishtown Bend - cleveland.com - February 9th, 2021 [February 9th, 2021]
- Developer closes on financing for $124M apartment project in West St. Paul - TwinCities.com-Pioneer Press - February 9th, 2021 [February 9th, 2021]
- Apartment Developers Increasing Unit Sizes For New Projects In Response To Pandemic - Bisnow - February 9th, 2021 [February 9th, 2021]
- A makeover for Norfolks deluxe apartment in the sky - WAVY.com - February 9th, 2021 [February 9th, 2021]
- Teacher housing plan moves ahead in Palo Alto - Palo Alto Online - February 9th, 2021 [February 9th, 2021]
- Guilderland and Pyramid seek to reverse ruling that halted companys projects - The Altamont Enterprise - February 9th, 2021 [February 9th, 2021]
- Another South U block demolished to make way for next Ann Arbor high-rise - MLive.com - January 3rd, 2021 [January 3rd, 2021]
- The Pandemic Disproved Urban Progressives Theory About Gentrification - The Atlantic - January 3rd, 2021 [January 3rd, 2021]
- The Sydney apartment tribes reshaping the harbour city - Sydney Morning Herald - January 3rd, 2021 [January 3rd, 2021]
- Editorial: Changes needed to build more middle-income housing - The Daily Herald - January 3rd, 2021 [January 3rd, 2021]
- 1 dead in 4-alarm Yonkers apartment building fire - Yahoo News - January 3rd, 2021 [January 3rd, 2021]
- ATF helping to investigate massive fire at Waldo Heights apartments - KMBC Kansas City - January 3rd, 2021 [January 3rd, 2021]
- With little effect on ground, work on Minneapolis 2040 plan continues behind the scenes - Minneapolis Star Tribune - January 3rd, 2021 [January 3rd, 2021]
- Construction of housing project for the elderly begins in Dupont - Insurance News Net - January 3rd, 2021 [January 3rd, 2021]
- COVID will leave lasting changes in Minnesota office and apartment projects - Minneapolis Star Tribune - December 23rd, 2020 [December 23rd, 2020]
- Three-story office building proposed to slide in between apartments, alley in Downtown Boise - boisedev.com - December 23rd, 2020 [December 23rd, 2020]
- US apartment construction boosts housing supply in November - Yahoo News - December 23rd, 2020 [December 23rd, 2020]
- Looking ahead: Fishers major projects in 2021 include the Nickel Plate Trail tunnel and First Internet - Current in Carmel - December 23rd, 2020 [December 23rd, 2020]
- Downtown development to focus on apartments | News - Bowling Green Daily News - December 23rd, 2020 [December 23rd, 2020]
- Developer Who Almost Landed Amazon HQ2 Planning Scores Of Apartments In Its Place - Bisnow - December 23rd, 2020 [December 23rd, 2020]
- Avenue breaks ground on 34th Street apartment complex - The Leader - December 23rd, 2020 [December 23rd, 2020]
- Hayle Harbour development celebrates milestone with topping out ceremony - In Your Area - December 23rd, 2020 [December 23rd, 2020]
- Here are 2020s most active architects - The Real Deal - December 23rd, 2020 [December 23rd, 2020]