The following road projects are planned for this week by the Midland County Road Commission and City of Midland Engineering Department:

City of Midland

Washington Street Road reconstruction, with one lane open in both directions from Eastlawn to Patrick.

Currie Parkway Bridge Closed for deck repairs and repainting of the bridge.

Rockwell Drive Southbound Rockwell closed with detour for the installation of a storm sewer to enclose roadside ditch from Kiesel to Patrick.

Elgin and Noeske streets Closed to traffic for replacement of water main on Elgin from Adelaide Street to Noeske and on Noeske from Elgin to Baker Street, as well as curb and gutter replacement, drainage structure repairs and street paving.

Airport Road Road reconstruction and bridge replacement over Sturgeon Creek, with road closure.

James Savage Road Closed for reconstruction from Washington Street to Saginaw Road.

Cambridge Street Closed to through traffic for reconstruction from St. Andrews Street to Boston Street. Curb and gutter repairs, drainage structure repairs, street paving.

Midland County

Follow this link:
Road work

Related Posts
August 10, 2014 at 1:03 pm by Mr HomeBuilder
Category: Gutter Installation