Home » Archives for January 2015 » Page 118
BUILDING PERMITS
PMT2014-03858 1909 Broadway; $55,010; Stephen Tebo; JD Plumbing & Construction; Tenant improvement to establish a co-located recreational and medical marijuana dispensary. Includes fire-rated dividing wall, and all associated MEPs.
PMT2014-04262 5075 Pearl Parkway; $4,500,000; City of Boulder; Wyatt Construction Co. Inc.; Two-story automobile dealership. the first floor consists of 8,343 square feet of dealership showroom, 10,233 square feet of service garage, 2,573 square feet of parts storage and 439 square feet service drive. the second floor consists of 1,729 square feet dealership offices, and 1,919 square feet of parts storage. Fire suppression sprinkler system by separate submittal, separate permit and separate review.
PMT2014-05019 3180 Sterling Circle; $134,864; Full Tilt; R M A Group / Alley Construction; Tenant interior finish for plumbing parts showroom, offices, and warehouse.
PMT2014-05273 1227 Spruce St.; $17,159; Spruce Street; Quinlan Construction Inc.; Interior, non-structural tenant remodel for law offices (Neugeborec O'Dowd). 296 square feet, MEPs included.
PMT2015-00059 1877 Broadway; $107,746; Broadway Walnut; Symmetry Builders Inc.; Replacement of north and south stairs at Randolph Parking garage.
PMT2015-00082 2180 Hillsdale Circle; $54,106; Shirley Leigh; Earth Saving Solutions; Flood recovery replace drywall, insulation, wiring and flooring, and install egress window. No apparent structural work/changes are evident in the approved plans. No approval is given or implied for any structural changes whatsoever in the scope of this permit. Any such work must receive prior review and approval.
PMT2015-00087 4118 Clifton Court; $55,512.96; Markel Homes; Markel Homes Construction Co.; Basement finish of 903 square feet to have two beds, one bath, and rec. room. Includes associated MEP. 172 square feet to remain unfinished, 94 square feet of existing finished area at base of stair to be remodeled.
PMT2015-00088 3250 Fifth St.; $21,450; William and Judy Erfling; Elton R. Construction LLC; Kitchen remodel new cabinets, main cabinet runs to have same layout, island configuration to change, new stove, fridge, countertops and sink. Wood floor to be refinished. Scope of work includes plumbing and electrical, no mechanical or structural included in this scope.
PMT2015-00089 350 Ponca Place; $16,356.38; Frasier Meadows; Frasier Meadows Manor; Unit 65 Interior, non-structural remodel is multifamily dwelling. Scope of work includes minor demo work, and reconfiguration of kitchen, new bedroom closets, minor expansion of second bath, and all associated MEPs, including new 100 amp subpanel.
More:
Boulder building permits: Jan. 26, 2015
Traffic backs up in Manatee County during a 2008 highway reconstruction project.
The Florida Department of Transportation advises drivers in Sarasota and Manatee counties to use caution this week in these areas where road crews may be working:
Sarasota County
I-75: From Sumter Boulevard to River Road: Construction project: This project expands I-75 to six lanes. Crews are clearing the median, installing drainage, excavating and building embankment, placing sod on the outside shoulders, and widening bridges at Deer Prairie Creek. Pay attention to traffic signs and barricades throughout the construction project, stay alert, and use caution in the work zone. Estimated completion is summer 2016. The contractor is Conalvias USA.
I-75 at Mile Marker 196: Maintenance project: Crews are making repairs to the shoulder. The outside northbound lane will close overnight from 9 p.m. to 5 a.m. on Thursday, January 29 while crews are working. Use caution and expect possible delays.
US 41 at SR 789: Maintenance permit project: The sidewalk located along the west side of US 41 from SR 789 to Ritz Carlton Drive and sidewalk located along the north side of SR 789 from Sunset Drive to US 41 will remain closed until construction of the development located at the corner of US 41 and SR 789 is complete. Pedestrians should follow the established detour.
US 41 from Marcia Street to Baywood Drive and from Reynolds Road to Gulf Gate Drive: Construction project: Crews are resurfacing the roadway, installing highway lighting, constructing sidewalk and making drainage improvements. Nighttime/overnight lane closures occur from 7 p.m. to 11 a.m. Expected completion is spring 2015. Ajax Paving is the contractor.
US 41 between Seminole Drive and Durian Road: Maintenance permit project: Crews are pouring curb and gutter for a driveway entrance. The northbound right lane will close from 9 a.m. to 4 p.m. Tuesday, January 20 through Friday, January 30. Use caution.
US 41 Between south of River Road and north of Biscayne Boulevard: Maintenance contracts project: Crews are making sidewalk repairs. Pedestrians should use caution while crews are working.
Manatee County
More:
TRAFFIC ADVISORY: Expect closed lanes, delays in these areas this week
Category
Driveway Paving | Comments Off on TRAFFIC ADVISORY: Expect closed lanes, delays in these areas this week
Worlds largest Silver Spade Construction , demolition Don Campbell Models 187
Here is a series of pics showing the construction of the Silver Spade Model and the last few pics show the real Silver Spade being demolished.
By: doncampbellequipment
Go here to read the rest:
Worlds largest Silver Spade Construction , demolition Don Campbell Models 187 - Video
Category
Demolition | Comments Off on Worlds largest Silver Spade Construction , demolition Don Campbell Models 187 – Video
Phone Call With Danny Jowenko Died 3 days latter
Jeff Hill (from Canada)- made this call in Canada to Germany (Danny Jowenko). Three days after PressTV did an interview with Dr. Sabrosky who mentioned Danny Jowenko - Danny was killed in...
By: UniBrowStudioVision
Read more:
Phone Call With Danny Jowenko Died 3 days latter - Video
Category
Demolition | Comments Off on Phone Call With Danny Jowenko Died 3 days latter – Video
Squad Down - Stealthy Boat Demolition! (LevelCap Chaboyy Azzy Matimio Byze)
3% Off Cheap Games! https://www.g2a.com/r/levelcap For More Gaming Tips and Tricks, Subscribe http://bit.ly/1lumAKr ChaBoyy: https://www.youtube.com/user/ChaBoyyHD Azzy: ...
By: LevelCapGaming
Original post:
Squad Down - Stealthy Boat Demolition! (LevelCap Chaboyy Azzy Matimio Byze) - Video
Category
Demolition | Comments Off on Squad Down – Stealthy Boat Demolition! (LevelCap Chaboyy Azzy Matimio Byze) – Video
IT IS now up to the court whether to push through Wednesday with the demolition of houses in a contested land bordering between Barangays Puntod and Macabalan after the City Government filed a motion to delay the displacement of the families living in the area.
Lawyer Edgar Cabanlas said Mayor Oscar Moreno asked him, on behalf of the local government, to file a motion to defer the execution of the writ of demolition scheduled this Wednesday.
Cabanlas said City Hall has asked Branch 25 of the Regional Trial Court to grant its motion that would allow Moreno to look for a relocation site for the residents within 90 days.
On January 25, the members of the Cagayan Integrated Landless Residents Association Incorporated (Cilrai) held a protest rally in front of the National Housing Authority (NHA)-Northern Mindanao in Puntod demanding the putting off of the demolition.
The group also went to the City Mayors Office to ask for his help.
Although Moreno is not much aware of the situation, Cabanlas said it was the mayors order to file the motion in court.
We did not promise them that they can get the land back, but to find a relocation site, he told Sun.Star Cagayan de Oro Monday.
He added the residents even hand-carried the motion and had it received in court.
Cabanlas said the City Government can find a resettlement site for the would-be affected residents in three months time if its petition is granted by the court, but the relocation would be farther from their original dwellings.
It would be hard, he added, for City Hall to buy the contested area since the city cannot afford the price.
View original post here:
City hopeful motion for stopping demolition to be granted
Category
Demolition | Comments Off on City hopeful motion for stopping demolition to be granted
Custom Home Builders Laguna woods CA
Custom Home Builders Laguna woods CA Looking for custom home builders Laguna woods CA? You have come to the right place to find custom home builders in Lagun...
By: Kris Neville
Originally posted here:
Custom Home Builders Laguna woods CA - Video
Custom Home Builders Lake Forest CA
Custom Home Builders Lake Forest CA Looking for custom home builders Lake Forest CA? You have come to the right place to find custom home builders in Lake Fo...
By: Kris Neville
Read more from the original source:
Custom Home Builders Lake Forest CA - Video
Custom Home Builders Lakeport CA
Custom Home Builders Lakeport CA Looking for custom home builders Lakeport CA? You have come to the right place to find custom home builders in Lakeport . We...
By: Kris Neville
Continue reading here:
Custom Home Builders Lakeport CA - Video
Custom Home Builders Lakewood CA
Custom Home Builders Lakewood CA Looking for custom home builders Lakewood CA? You have come to the right place to find custom home builders in Lakewood. We ...
By: Kris Neville
View post:
Custom Home Builders Lakewood CA - Video
« old entrysnew entrys »