Home » Archives for June 2014 » Page 9
Leominster: 2014 Summer Stroll: Demolition
Recorded June 28, 2014 We saw the setup, parade, and event videos, so there #39;s one left: the demolition video. We walk through the festival after closing, to see what #39;s left, and others taking...
By: georgef551
More here:
Leominster: 2014 Summer Stroll: Demolition - Video
Category
Demolition | Comments Off on Leominster: 2014 Summer Stroll: Demolition – Video
Watch 08/24/2013 Rt 66 Team Demolition Derby Round 1 Race 4 Real
Watch 08/24/2013 Rt 66 Team Demolition Derby Round 1 Race 4 Real Steel Vs. Full Throttle - Full Race Route 66 http://tinyurl.com/nhra-live-channel/?29--june-onwards-watch-live-oreilly-auto-parts-ra...
By: Cesc Fabregas-NHRA
Excerpt from:
Watch 08/24/2013 Rt 66 Team Demolition Derby Round 1 Race 4 Real - Video
Category
Demolition | Comments Off on Watch 08/24/2013 Rt 66 Team Demolition Derby Round 1 Race 4 Real – Video
Force to housing demolition in Shanghai, China 2014
69 years old lady #39;s private house was forced to pull down by Shanghai Yangpu District People #39;s Government on 24th June 2014. During the course, the old lady was held under duress and lost personal...
By: cn DD
The rest is here:
Force to housing demolition in Shanghai, China 2014 - Video
Category
Demolition | Comments Off on Force to housing demolition in Shanghai, China 2014 – Video
Introducing sT Leech | 100+ on Demolition
Please drop a like, comment subscribe 🙂 Player: sT Leech Commentator: sT Locker https://www.youtube.com/user/ejhbarker Song: Logic - Set The Tone.
By: SimpleTalent
Read the original post:
Introducing sT Leech | 100+ on Demolition - Video
Category
Demolition | Comments Off on Introducing sT Leech | 100+ on Demolition – Video
Associated Press
Posted on June 29, 2014 at 9:23 PM
PADUCAH, Ky. (AP) Demolition is continuing on the last of 32 inactive facilities scheduled to be removed at the former nuclear enrichment facility in Paducah.
The C-410 complex is roughly the size of four football fields and was used from 1957 to 1977 to produce uranium hexaflouride and fluorine.
The Paducah Sun reports (http://bit.ly/1jZNKqE) demolition is scheduled to be completed this fall.
Operators are cutting steel and other debris into smaller pieces to be shipped in heavily lined and covered railcars to a commercial disposal site. In 2012 and 2013, workers used special equipment to treat nearly two miles of uranium hexafluoride piping to make it safe for removal at the site.
LATA Kentucky is the U.S. Department of Energy contractor handling the demolition.
___
Information from: The Paducah Sun, http://www.paducahsun.com
Link:
Demolition continuing at former uranium plant
Category
Demolition | Comments Off on Demolition continuing at former uranium plant
Tunbridge Wells cinema site demotion due to start today
DEMOLITION of the derelict ABC cinema site in Tunbridge Wells is due to start today (Monday).
Contractors are expected to start sealing off the site in readiness for a soft strip removing the interior of the site on July 14.
The redevelopment of the site is one of the most long-awaited events in the town, with public outrage at its decrepit appearance and concern at the potential harm to the economy and tourism because of the empty shops.
The cinema has stood empty since it the cinema closed in 2000.
The target date for completion of demolition is October 17 with a final two weeks of tidying up the site.
Developer Bellhouse Joseph revealed the timetable of works to the Courier last month.
It also said talks had broken down with Waitrose over rental rates.
The knocking down of the structures will start on July 21 and scaffolding will be erected.
As the Courier has reported, work will start on the south side and progress to the north, with the cinema last to be flattened.
Go here to read the rest:
Tunbridge Wells cinema site demolition due to start today
Category
Demolition | Comments Off on Tunbridge Wells cinema site demolition due to start today
WEST CHESTER TWP.
A Butler County-based developer with more than three decades of experience is helping bring a new and final phase to an upscale residential community.
David Clinton of David J. Clinton and Company in Hamilton this month launched The Estates of Treillage, which sits south of Hamilton-Mason Road just east of the border between West Chester and Fairfield townships.
Clinton, who has developed 19 subdivisions since 1978 and run about nine homeowners associations, said hes well aware of the challenges and pitfalls of developing on the site and well equipped to handle them.
I came in here with the resources and the business experience to operate it successfully, Clinton said.
The second phase of the Treillage development will feature 37 residential estate homes with lot sizes of between half to one acre each.
Homeowners may choose from a variety of building lots on wooded home sites featuring panoramic views and flexible setbacks, with the ability to accommodate sprawling floor plans of as much as 12,000 square feet, said Susan Horner of Keller Williams Pinnacle Group Realty.
Instead of being limited to the first phases Frank Lloyd Wright-style of architecture, residents of The Estates will get to consult with home builders The Leland Group or Somerset Custom Homes to help tailor the design, materials, amenities and character of each home from start to finish.
Its true custom design, Horner said. When you have select custom builders, what that means for the consumer is a one-of-a-kind home. That assists in maintaining the value.
Prices for each home will start in the $500,000 range and could top out at $1.5 million, she said.
See original here:
Upscale development launches custom-design second phase
Category
Custom Home Builders | Comments Off on Upscale development launches custom-design second phase
Carpet tile pebble tec Cleaning Kingsburg Reedley Dinuba Cutler Orosi CA
Carpet Cleaning ~Tile Cleaning ~ Pebble Tec Cleaning Pet repairs (559)802-2474 Kingsburg Reedley Dinuba Cutler Orosi.
By: James Terry
Read the original here:
Carpet tile pebble tec Cleaning Kingsburg Reedley Dinuba Cutler Orosi CA - Video
Category
Carpet Cleaning | Comments Off on Carpet tile pebble tec Cleaning Kingsburg Reedley Dinuba Cutler Orosi CA – Video
Park City, Utah (PRWEB) June 30, 2014
A matted carpet is a common problem that many house owners have to contend with. Carpets which are kept in areas that have high movement such as the living room can get worn and old look quite fast. This matted appearance can also be seen in corners where furniture has been kept on the carpet for long periods of time. A recent survey by Kalia regarding Park City floors reveals that it takes regular cleaning and maintenance to ensure the best performance from a carpet.
Founder, Scott Heath, comments. "The term 'performance' with reference to carpets is a measure of how well a carpet maintains its original texture and appearance under normal traffic. Each carpet is different and has its own unique characteristics." He continues. "The characteristics of varying carpets is put to the test by the elements that are tracked in from footwear. This is magnified when it comes to Utah, particularly Park City floors, where you get sunshine one day, rain the next, and extreme snow during the winter."
These quality and characteristics of carpet depend on the raw materials used in construction and also on the design choices of the company. For example, natural fibers such as wool tend to wear gradually but this isn't the case with synthetic fibers. The study revealed the following as the primary causes of matted or premature wear on carpet.
Density of Carpet
The density references how close the strands of the carpet have been woven together. The denser a carpet is, the longer it will last. Density will also affect the appearance of a carpet and can even make a low quality product look grand. While it is best to keep away from carpets with a low face weight, high density can compensate for the lack of weight. For example, old nylon carpets last for years even after extensive use. This is because nylon is naturally a dense material. If the density of carpet were to be reduced, then it would need an increase in the amount of yarn and twist to maintain the same level of performance.
Tightness of Twist
This refers to how tightly the fibers have been wound around each other. Generally the more tight the twist is, the better will be the carpet's performance, though it will lead to a reduction in the total bulk. It can be thought of as analogous to a knot. If there are a number of twists and turns in the knot, then the chances of unravelling become much smaller. Similarly, a carpet with a high twist level will not get matted very fast. To judge the twist level of a carpet, carefully examine the cut ends of the individual yarns. If they are neat and clearly defined, then that means the carpet has a good tightness of twist.
Face Weight
This is the total weight of the fibers in the carpet measured in ounces per square yard. It provides a good idea of how much material is present in the carpet, and hence is an indicator of how quickly the carpet will wear out. Generally a carpet with a high face weight will not get matted fast as it tends to be more dense. But this might not always be the case. Sometimes when fibers of long length are used, the density of the carpet tends to be very less. It will lead to a good face weight but might not have the best quality.
More here:
Park City Flooring Company, Kalia, Releases Study on Factors Affecting Carpet Performance
Category
Carpet Cleaning | Comments Off on Park City Flooring Company, Kalia, Releases Study on Factors Affecting Carpet Performance
Agoura Hills Block Wall Retaining Wall Repair Shafran Masonry Construction 818-735-0509
Web site: http://www.shafranconstruction.com Email: shafranconst@gmail.com Phone: 818-735-0509 Choose the #1 Company in Los Angeles and Ventura County for your next...
By: Jordan Shafran
See the original post here:
Agoura Hills Block Wall Retaining Wall Repair Shafran Masonry Construction 818-735-0509 - Video
Category
Retaining Wall | Comments Off on Agoura Hills Block Wall Retaining Wall Repair Shafran Masonry Construction 818-735-0509 – Video
« old entrysnew entrys »